A flexible comprehensive support structure for red bed rock slope and its construction method
A support structure and rock slope technology, applied in the field of geotechnical engineering, can solve the problems of untimely support, high cost, poor ductility and dynamic performance, etc., and achieve the effect of improving self-sustaining ability, convenient construction and reducing disturbance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0073] See attached figure 1 , 2 , 3, 4, 5, 6, 7, a flexible comprehensive support structure for a red bed rock slope, the flexible comprehensive support structure includes: an advance grouting reinforcement structure before excavation, and an anchor grouting reinforcement structure after excavation structure, slope normal prestressed reinforcement structure, miniature anti-slide piles; the advanced grouting reinforcement structure before excavation is to drill the first grouting hole 1 on the rock and soil of the first level slope before excavation, and the first The grouting hole 1 is drilled in the vertical direction, the depth reaches 1-2m below the horizontal position of the slope top of the second grade, and the first grouting hole 1 is injected with high pressure to the designed contour line of the first grade slope The following positions are used to form a root network grout complex with strong shear resistance in the non-excavated rock and soil below the Lunguo line...
Embodiment 2
[0079] The difference between this embodiment and Embodiment 1 is that one end of the three anti-slide rods 801 in the miniature anti-slide pile 8 is fixedly connected, and the other ends form a certain angle with each other in different planes; and among the three anti-slide rods 801, the one closest to the subgrade One rod is substantially perpendicular to the subgrade plane 14, and the other two are approximately perpendicular to the potential sliding surface 15 at the slope corner.
Embodiment 3
[0081] A construction method for a flexible comprehensive support structure of a red bed rock slope, comprising the following steps:
[0082] The first step: advanced grouting reinforcement before excavation
[0083] According to the field geological investigation results of the red layer slope, before the excavation of the slope, the first grouting hole 1 is drilled in the rock and soil of the first level slope, and the first grouting hole 1 is drilled along the vertical direction, and the depth reaches the second level. 1-2m below the horizontal position of the top of the first-grade slope, the first grouting hole 1 is provided with a grouting steel flower tube, and the first grouting hole is high-pressure grouted to the position below the designed slope contour line 2, so that In the non-excavation rock and soil below the slope contour line 2, a root network slurry vein complex with strong shear resistance is formed to strengthen the non-excavation rock and soil; reduce the...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com



