A technology of winding and forming pipes, which is applied in the direction of tubular objects, other household appliances, household appliances, etc., can solve the problems of limited pipe production and inability to meet demand, so as to improve the laying effect, reduce the difficulty of production operation, and prevent breakage Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0048] Embodiment 1: A kind of vertical large-scale pipe winding forming equipment, such as figure 1 As shown, it includes an extruder 2 installed on the foundation 1, a gluing machine 3, a strip laying machine 4 and a pipe forming machine. The extruder 2 extrudes a strip 8, and the strip 8 is glued by the gluing machine 3 , the glue-coated strip 8 passes through the strip laying machine 4 to make a pipe on the pipe forming machine.
[0049] refer to figure 2 and image 3 , the extruder 2 includes a frame 21, a feed bin 22 fixed on the frame 21 and a screw pushing part 23, and a head 24 installed on the end of the screw pushing part 23 away from the feed bin 22, the head 24 is provided with an outlet Material opening 241. The plastic raw material is stored in the silo 22 , is transported to the head 24 after being heated and melted at the screw pushing part 23 , and then extruded to form a strip 8 . Machine head 24 comprises mold core and mouth die, and the band material ...
Embodiment 2
[0072] Embodiment 2: A kind of vertical large-scale pipe winding forming equipment, such as Figure 12 As shown, the difference from Embodiment 1 is that the tape laying mechanism 4 is omitted. Compared with Embodiment 1, the advantage is that when the height difference between the roller 6 and the extruder 2 is small, the upper strip 8 is squeezed by the strip 8 fixed on the roller 6 below, so that the strip 8 is along the Roller 6 spirals up. Due to the omission of the strip laying mechanism 4 , the production of shorter pipelines saves equipment space in comparison.
Embodiment 3
[0073] Embodiment 3: A vertical large-scale pipe winding and forming equipment. The difference from Embodiment 1 is that the glue spreader 3 is eliminated, and the glue extruder is fixed on the slide 44. After the strip 8 is wound on the roller 6 , the rubber extruder extrudes the glue on two adjacent strips 8 . According to needs, the foot squeezer can be a small plastic extruder.
[0074] Compared with the first embodiment, the advantage of the second embodiment is that the glue coating time on the strip 8 is later, preventing the glue from solidifying in advance and causing the strip 8 to be bonded and fixed incorrectly. In addition, it is possible to prevent the glue on the strip 8 from sticking to sundries or dripping onto the work site to cause pollution during transportation.