Combined bridge-pier assembling work platform

A working platform and combined technology, which is applied in the direction of erecting/assembling bridges, bridges, bridge parts, etc., can solve the problems of inconvenient movement, etc., and achieve the effects of improving construction efficiency, saving human resources, and simple operation

Pending Publication Date: 2019-02-19
广东腾盛模架科技有限公司
View PDF0 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The purpose of the present invention is to provide a combined bridge pier assembly work platform, which has the advantage of being convenient to move, and solves the problem that the common combined bridge pier assembly work platform is not easy to move

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Combined bridge-pier assembling work platform
  • Combined bridge-pier assembling work platform

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0015] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0016] see Figure 1-2 , a combined pier assembly work platform, comprising a base 1, the top of the base 1 is fixedly connected with a work platform body 2, the left and right sides of the bottom of the base 1 are provided with openings 3, and the front and rear sides of the inner wall of the opening 3 are fixed by The shaft 4 is fixedly connected, the surface of the fixed shaft 4 is movably connected with a roller 5, the bottom of the roller 5 runs through t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a combined bridge-pier assembling work platform. The combined bridge-pier assembling work platform comprises a base, a work platform body is fixedly connected to the top of thebase, through openings are formed in the left side and the right side of the base, the front sides and the back sides of the inner walls of the through openings are fixedly connected through fixed shafts, rolling wheels are movably connected to the surfaces of the fixed shafts, the bottoms of the rolling wheels penetrate through the through openings and extend to the outside of the rolling wheels. According to the combined bridge-pier assembling work platform, the base, the through openings, the fixed shafts, the rolling wheels, rolling bearings, a threaded rod, threaded sleeves, first movable shafts, a driven bevel gear, a positive-negative motor, a positive-negative rotating shaft, a driving bevel gear, supporting plates, supporting columns, arc clamping blocks, triangular blocks, supporting springs, sliding grooves, sliding rods, sliding blocks, pulleys, fixing plates, second movable shafts, connecting rods and a controller are mutually matched, the effect that moving is convenientis achieved, operation is easy, time and labor are saved, manpower resources are greatly saved, the construction efficiency is improved accordingly, and the combined bridge-pier assembling work platform brings great convenience to a construction party.

Description

technical field [0001] The invention relates to the technical field of bridge engineering, in particular to a combined bridge pier assembly operation platform. Background technique [0002] At present, the construction method of bridge piers is generally to build a construction work platform on the periphery, and use the construction work platform to carry out assembly operations. The common combined pier assembly operation platform is not easy to move. When the operation platform needs to be moved, it often takes a lot of manpower to carry it, which is time-consuming and labor-intensive. It not only increases the labor intensity of the staff, but also affects the construction efficiency. It has brought great inconvenience. Contents of the invention [0003] The purpose of the present invention is to provide a combined bridge pier assembly operation platform, which has the advantage of being convenient to move, and solves the problem that the common combined bridge pier a...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E01D21/00E01D19/02
CPCE01D21/00E01D19/02
Inventor 方宏广
Owner 广东腾盛模架科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products