Method for rapidly pulling larssen steel sheet pile out of limited space
A technology of Larsen steel sheet piles and confined spaces, applied in sheet pile walls, buildings, infrastructure engineering, etc., can solve the problems of 4 hours of welding, waste of manipulator shifts, waste of finished sheet piles, etc. Achieve the effect of low cost, saving construction period and saving labor
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0015] The method for quickly pulling out a Larsen steel sheet pile in a confined space of the present invention comprises:
[0016] Step 1: Make a pull-out tool, which includes an integrated upper anti-skid plate 1 and a lower clamping slot 2 for clamping the head of the main Larsen steel sheet pile. Corresponding through holes 3 are opened on both sides of the clamping slot. see figure 1 ;
[0017] Step 2, opening holes at the head of the Larsen steel sheet pile;
[0018] Step 3, align the slot of the extraction tool with the Larsen steel sheet pile and insert it so that the through holes of the two correspond, and then insert the pin shaft to fix it;
[0019] Step 4, using a manipulator vibrating hammer to clamp the extraction tool and extract the sheet pile;
[0020] Step five, remove the extraction tool for recycling.
[0021] In the method for quickly pulling out the Larsen steel sheet pile in a confined space, step 2 further includes grinding around the hole wall.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
