A technology for seamless steel pipes and tube blanks, which is applied in the field of seamless steel pipe processing, can solve the problems of equipment not being able to be used normally, unsatisfactory use, seamless steel pipe openings, etc., and achieve low cost, good mechanical properties, and simple preparation methods Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0020] A method for preparing a seamless steel pipe, wherein the seamless steel pipe is composed of the following components in parts by weight: 30 parts of carbon, 15 parts of manganese, 5 parts of zinc, 5 parts of aluminum, 2 parts of phosphorus, 2 parts of titanium, tantalum 5 parts, 2 parts of magnesium, 2 parts of chromium, 1 part of nickel, 0.2 parts of copper, and the balance of iron.
[0021] Described seamless steel pipe comprises the following steps:
[0022] (1) taking raw materials according to the parts by weight of the above-mentioned required raw materials;
[0023] (2) Clean up the unnecessary sundries in the above-mentioned raw materials;
[0024] (3) smelting after mixing the raw materials evenly;
[0025] (4) Put the smelted solution into the pipe-making mold, and obtain the tube blank through smelting;
[0026] (5) Place the tube blank at 1200°C for 40 minutes;
[0027] (6) Subsequent thermal processing, then cooling, to obtain the seamless steel pipe; ...
Embodiment 2
[0031] A method for preparing a seamless steel pipe, wherein the seamless steel pipe is composed of the following components in parts by weight: 30 parts of carbon, 15 parts of manganese, 5 parts of zinc, 5 parts of aluminum, 2 parts of phosphorus, 2 parts of titanium, tantalum 5 parts, 2 parts of magnesium, 2 parts of chromium, 1 part of nickel, 0.2 parts of copper, and the balance of iron.
[0032] Described seamless steel pipe comprises the following steps:
[0033] (1) taking raw materials according to the parts by weight of the above-mentioned required raw materials;
[0034] (2) Clean up the unnecessary sundries in the above-mentioned raw materials;
[0035] (3) smelting after mixing the raw materials evenly;
[0036] (4) Put the smelted solution into the pipe-making mold, and obtain the tube blank through smelting;
[0037] (5) Place the tube blank at 1250°C for 50 minutes;
[0038] (6) Subsequent thermal processing, then cooling, to obtain the seamless steel pipe; ...
Embodiment 3
[0042] A method for preparing a seamless steel pipe, wherein the seamless steel pipe is composed of the following components in parts by weight: 40 parts of carbon, 22 parts of manganese, 10 parts of zinc, 10 parts of aluminum, 5 parts of phosphorus, 5 parts of titanium, tantalum 8 parts, magnesium 5 parts, chromium 5 parts, nickel 3 parts, copper 0.5 parts, iron balance.
[0043] Described seamless steel pipe comprises the following steps:
[0044] (1) taking raw materials according to the parts by weight of the above-mentioned required raw materials;
[0045] (2) Clean up the unnecessary sundries in the above-mentioned raw materials;
[0046] (3) smelting after mixing the raw materials evenly;
[0047] (4) Put the smelted solution into the pipe-making mold, and obtain the tube blank through smelting;
[0048] (5) Place the tube blank at 1300°C for 40 minutes;
[0049] (6) Subsequent thermal processing, then cooling, to obtain the seamless steel pipe;
[0050] (7) The se...