Mounting method of prefabricated pipe gallery
An installation method and pipe gallery technology, which is applied in water conservancy projects, artificial islands, underwater structures, etc., can solve the problems of long installation period of prefabricated pipe gallery and large excavation of earthwork, so as to reduce precipitation and support work, Fast backfill, low noise effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0014] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments It is a part of embodiments of the present invention, but not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.
[0015] figure 1 It is a flowchart of a method for installing a prefabricated pipe gallery according to an embodiment of the present invention, such as figure 1 As shown, the method includes:
[0016] S1, horizontally hoist the current prefabricated pipe gallery unit into the predetermined track, so that the current prefabricated pipe gallery uni...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com