A kind of construction method of ground connection wall forming groove
A technology of trough construction and ground connection wall, which is applied in excavation, sheet pile wall, foundation structure engineering and other directions to achieve the effect of avoiding slow progress, controllable safety and quality, and simple process
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0045] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0046] like Figure 1~Figure 9 The construction method of "three grasping nine holes and two grasping five holes" ground connection wall construction method is applicable to the construction of all ground connection wall structures with soft top and hard bottom, which not only meets the requirements of the construction period, but also meets the quality requirements of the ground connection wall. Described construction method comprises the following steps:
...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


