Large-slope inclined well concrete transportation method

A transportation method and concrete technology, which is applied in earth cube drilling, underground transportation, transportation and packaging, etc., can solve the problems of high concrete performance requirements, affecting the stability and safety of caverns, and high maintenance and operation requirements, so as to meet the needs of construction progress and reduce Effect of construction interference and reduction of construction cost

Active Publication Date: 2019-04-26
CHINA RAILWAY SIXTH GRP TIANJIN RAILWAY CONSTR +1
View PDF6 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Disadvantages: The cavern must be buried deep and shallow, which requires high concrete performance, and is prone to concrete segregation and pipe plugging
Disadvantages: The cavern must be expanded, occupying a large area, high investment costs, and prone to stress concentration, affecting the stability and safety of the cavern
Disadvantages: the transportation needs to be transported twice, the maintenance operation requirements are high, and the safety risk is large

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Large-slope inclined well concrete transportation method
  • Large-slope inclined well concrete transportation method
  • Large-slope inclined well concrete transportation method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0027] The length of 1# inclined shaft in a certain project is 820.791m, the comprehensive slope is 31.852%, the section size of the tunnel is 5.0m×5.5m (width×height), and the section size of the main tunnel in the branch tunnel control section is 4.2m×5.0m (width× High), the construction difficulty is high, the safety risk is high, and it is a key and difficult control project. After the excavation is completed, the lining concrete construction, how to choose the concrete transportation construction method reasonably, so as to scientifically organize the construction of each process closely, is the key to ensure the smooth construction of the project . According to the construction conditions, engineering quantity, and construction period requirements, after the demonstration and optimization of the construction technical plan, it was decided to adopt the concrete transportation method of the steep inclined shaft provided by the present invention, which effectively solved the...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a large-slope inclined well concrete transportation method which comprises the following steps of building a concrete mixing plant; equipping with a ground concrete stirring transportation tank car; pouring a hole concrete unloading platform; laying rails, putting a wheel-rail concrete stirring transportation tank car on the rails, and dragging the wheel-rail concrete stirring transportation tank car with a single-rope mine drum hoist arranged at an inclined well hole; pouring a hole bottom concrete unloading platform, and equipping with a hole bottom concrete stirringtransportation tank car; transporting concrete in the concrete mixing plant to the hole concrete unloading platform with the ground concrete stirring transportation tank car; transporting the concreteinto the wheel-rail concrete stirring transportation tank car; transporting the concrete in the wheel-rail concrete stirring transportation tank car into the hole bottom concrete stirring transportation tank car; transporting the concrete in the hole bottom concrete stirring transportation tank car to a pouring site in a main hole and the like. The large-slope inclined well concrete transportation method can realize the targets of rapidness in transportation and safety in construction of inclined well concrete, ensures main hole lining concrete construction, reduces construction interferenceand lowers the construction cost.

Description

technical field [0001] The invention belongs to the technical field of tunnel construction, and in particular relates to a method for transporting concrete in a large-slope inclined shaft. Background technique [0002] According to the "Construction Specifications for Underground Excavation of Hydraulic Structures", the scale of underground caverns is divided according to the excavation size and section size of underground caverns. According to the inclination angle, it can be divided into three types: flat tunnel, inclined shaft and vertical shaft. Among them, the inclination angle is 6 °-75° is an inclined well. In case of a steep slope, there are certain restrictions on the construction method and equipment selection, and the construction safety risk level is correspondingly increased. Therefore, it is difficult to choose a scientific and reasonable construction method to ensure the safety of construction operations, to organize construction quickly and effectively, and ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E21F13/04E21D11/10
CPCE21D11/105E21F13/04
Inventor 高俊马陆民贺龙马立超侯建辉王瑞赵德润刁帅铭毕福斌李世鑫
Owner CHINA RAILWAY SIXTH GRP TIANJIN RAILWAY CONSTR
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products