A method for improving the data accuracy of the whole power grid model based on the verification rule base
A technology of model data and the whole power grid, which is applied in the field of power system grid, can solve problems such as difficult to guarantee data accuracy, not too close connection, inconsistent data definition, etc., to achieve the effect of solving difficult to guarantee and improving accuracy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0023] like figure 1 As shown, the method for improving the data accuracy of the whole power grid model based on the verification rule base according to the present invention first needs to map the definition table according to the established model and use the ETL (such as KETTLE) tool to obtain various locations from various surveys on this basis. Adjust the model files of heterogeneous systems, and integrate the data to form the model data of the whole network. Since the model data of the whole network needs to be provided to monitoring, analysis and other applications, it is necessary to ensure that the data is accurate and that abnormal data can be captured in time and fed back to local dispatchers for processing. Therefore, it is necessary to establish a configurable, flexible and comprehensive verification rule base to verify the acquired model data of the whole network, and to classify and count the abnormal data obtained and distribute it to each region to allow users...
Embodiment 2
[0040] The main contents of the present invention include: studying how to uniformly define the equipment models and attribute data of the heterogeneous systems, and using the model mapping definition table to convert the equipment models and attributes of the heterogeneous systems into a unified standard definition format to form a unified standard definition format. For data model files, the online distributed power grid model standard based on the IEC 61970 standard is a good choice. Of course, you can flexibly change the definition format according to your own needs. You only need to reconfigure the model mapping definition table to meet the requirements.
[0041]The establishment of the verification rule base after the research model is integrated is mainly divided into three parts: public data verification, business rule verification, and node topology relationship verification.
[0042] The following takes the factory station and current transformer as an example to intr...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
