Non-well-killing tripping method for gas drilling of reservoir
A gas drilling and tripping technology, which is applied to valve devices of wellbore/well, components of wellbore/well, earth-moving drilling and production, etc., can solve the problems of poor efficiency of input and output, easy damage, and difficult to find, etc. Achieving the effect of strong security and operability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] As a preferred embodiment of the present invention, it discloses a method for snubbing and tripping in reservoir gas drilling, including wellhead device configuration, sand discharge pipeline configuration, snubbing and tripping process and snubbing and tripping process Four parts, wherein: the wellhead device configuration is configured to configure reservoir gas drilling wellhead control facilities for snubbing and tripping; the sand discharge pipeline configuration is for reservoir gas drilling to perform snubbing and tripping The combustible gas ground discharge channel has a diameter of not less than 203mm. The sand discharge pipeline is laid straight to the combustion pool. If there is a change of direction due to conditions, the turning angle in the well site is not less than 150°, and the sand discharge pipeline ends at the edge of the well site. The pressure relief safety valve is installed in the straight-through direction, and the set pressure is not higher th...
Embodiment 2
[0034] Referring to the accompanying drawings of the description, as the best implementation mode of the present invention, it includes four parts: wellhead device configuration, sand discharge pipeline configuration, snubbing tripping process and snubbing tripping process, wherein:
[0035] Wellhead device configuration is a wellhead control facility for reservoir gas drilling to perform snubbing and tripping, including rotary blowout preventer 3, annular blowout preventer 5, double ram blowout preventer 15, drilling four Pass 8, throttle manifold 21, blowout prevention pipeline 13 and blowout pipeline 22;
[0036] Annular blowout preventer 5 controls the pressure to be lowered to 5.0-6.0Mpa when pulling out the drill.
[0037] The double ram blowout preventer 15 is installed on the half-sealed ram 6, and the fully-sealed ram 7 is installed on the bottom.
[0038] A hydraulic flat valve 14 is installed near the wellhead side of the blowout prevention pipeline 13. The hydraul...
PUM