[0043] An integral laminated slab composite beam, comprising a plurality of composite sub-beams that can be connected to each other, the composite sub-beams include a prefabricated layer, the prefabricated layer has a plurality of overlapping steel bars 2, and a plurality of prefabricated sub-beams The sides of the layers are all provided with joints 3, and the overlapping steel bars 2 are exposed from the joints 3; the tops and sides of multiple composite sub-beams are covered and connected by the post-casting layer 7; the prefabricated layer and the post-casting Layers 7 are connected by truss bars 1 . The post-cast layer 7 is connected to at least one straight side of the steel beam 5 through a shear connector 6 . The scheme disclosed in the present invention solves the problem of insufficient integrity of the prefabricated slab 4 by combining the prefabricated slab 4 with the post-cast layer 7, uses the truss steel bar 1 as an auxiliary connection between the prefabricated...
Embodiment 2
[0059] A method for manufacturing an integral laminated slab composite beam, comprising the following steps:
[0060] - weld the shear connector 6 on the upper flange of the steel beam 5;
[0061] -Processing the prefabricated slab 4, when the prefabricated slab 4 is processed, the truss reinforcement 1 needs to be pre-placed in the slab, a part of the truss reinforcement 1 is embedded in the prefabricated slab 4, and the other part is embedded in the post-cast layer after the post-cast layer is poured;
[0062] - Place one end of the prefabricated slab 4 on the upper flange of the steel beam 5, and the shelving size is set according to the design requirements.
[0063] -Leave a certain length of overlapping steel bars 2 at the splicing parts of adjacent prefabricated panels 4. The position of the overlapping steel bars 2 is also the joint 3 between adjacent prefabricated panels 4. A part of the formwork should be laid under the joints 3 .
[0064] - laying prefabricated sla...