Construction method of large-span fragmented integrated double t-slab
A construction method and integrated technology, applied in the processing of building materials, construction, building construction, etc., can solve the problems of rising transportation costs, lagging project progress, obvious defects, etc., reducing the on-site workload and strong engineering applicability. , the effect of broad application prospects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] Step 1: Prefabricated fins and ribs in slices, including the reservation of connectors and shear grooves;
[0040] Step 2: At the assembly site, the ribs are first assembled into ribs, and the two ribs are aligned and erected in parallel;
[0041] Step 3: Flatten each fin on the floor, keep the connecting piece into the shear groove, and tighten the end of the fin;
[0042] Step 4: Pre-tension the wings and ribs, and adjust the position of each connection point;
[0043] Step 5: Hoist the assembled and integrated split-integrated double T-board to the required position.
[0044] The piece-integrated double T-plate structure proposed by the present invention adopts piece-wise prefabrication and on-site integrated assembly, which is convenient for transportation and storage in the yard, thereby greatly reducing the construction period, thereby bringing economic benefits, and has broad application prospects. The development of modern architecture has brought great impetu...