Construction method of coiled tubing drilling and grinding underbalanced cement plug operation
A construction method and cement plug technology are applied in the field of construction, coiled tubing drilling and grinding underbalanced cement plug operation, and can solve the problems of high trap pressure, inability to control the wellhead balanced pressure in the drilling and grinding process, and low construction efficiency. The effect of preventing blowouts, improving operational efficiency and process safety levels
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] A coiled tubing drilling and grinding underbalanced cement plug operation construction method, the method specifically is to first use the ground choke manifold 10 to control, maintain the balance pressure in the wellbore 7 above the cement plug, and then use the small-diameter grinding shoe 5 or small drill bit to load the drill pressure, drill and grind the cement plug 8; when drilling through the cement plug 8, release the balance pressure P 套 and liquid column pressure P 液 To balance the wellbore trap pressure P under the cement plug 地 ; Bleeding and releasing the pressure through the discharge port 11, circulating the wellbore; and then changing the large-diameter grinding shoe 9 to clean up the cement plug until the cement plug is completely drilled out.
Embodiment 2
[0035] Such as figure 1 As shown, a coiled tubing drilling and grinding underbalanced cement plug operation construction method specifically includes the following steps:
[0036] Step 1): Install and inspect the coiled tubing equipment and the ground choke manifold 10, connect the discharge pipe of the coiled tubing equipment to the ground choke manifold through the wellhead cross 3, and install the anti-seismic pressure on the upper part of the wellbore 7 Table: The coiled tubing of the coiled tubing equipment is connected in series with the tool string with the small-diameter grinding shoe 5 and merged into the well;
[0037] Step 2): The tool pipe string with the small-diameter grinding shoe 5 is probed to the cement plug surface; the tool pipe string with the small-diameter grinding shoe 5 is composed of a coiled tubing joint, a motor head assembly, a screw motor and a small-diameter grinding shoe 5 are connected from top to bottom; the diameter of the small-diameter gri...
Embodiment 3
[0049] On the basis of Example 2, the initial section of the coiled tubing must be straightened by more than 2 meters to ensure that the tool string is centered during drilling and grinding. Step 8) When replacing the tool pipe string with a large-diameter grinding shoe to clean the cement plug, it is not necessary to control the sleeve to release the balance pressure P 套 .
[0050] The coiled tubing equipment mainly includes a power source 1, an injection head 2, a blowout preventer, a connecting oil pipe, a blowout pipe, etc., and the connecting oil pipe passes through the wellhead cross 3 on the wellbore 7 and is connected to the connecting oil pipe joint of the tool string 4 , the tool pipe string 4 is a tool pipe string with a small-diameter grinding shoe or a tool pipe string with a large-diameter grinding shoe. The blowout preventer is connected with the ground choke manifold 10; the power source 1 includes a diesel engine, pump, fuel tank and control system; the coile...