Hoisting construction safety method for reinforcement cage of underground continuous wall
A technology of underground diaphragm wall and steel cage, which is applied in cranes, sheet pile walls, transportation and packaging, etc., can solve the problems of increased construction cost, long construction period and long construction time.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0062]In order to make the object, technical solution and advantages of the present invention more clear, the present invention will be further described in detail below in conjunction with the examples. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.
[0063] The application principle of the present invention will be described in detail below in conjunction with the accompanying drawings.
[0064] like Figure 1-5 As shown, the underground diaphragm wall reinforcement cage hoisting construction safety method provided by the embodiment of the present invention includes:
[0065] S101: Command the two cranes of 260t and 150t to transfer to the lifting position, and the lifting workers install the shackles of the lifting points respectively;
[0066] S102: After checking the installation condition of the wire ropes of the two cranes and the center of gravity under force, ho...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


