High-bending-resistance hold hoop joint mechanically connected with precast concrete beam-column pile rods
A prefabricated concrete and mechanical connection technology, applied in sheet pile walls, foundation structure engineering, construction, etc., can solve the problems of short service life, non-environmental protection of on-site pouring, long construction period, etc., to eliminate processing deviation and assembly gap, improve Connection quality and effect, effect of avoiding welding process operations
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Example Embodiment
[0040] Example 1
[0041] Such as figure 1 As shown, the hoop joint for connecting precast concrete beam-column piles with strong bending mechanically includes two oppositely arranged reinforcing hoops 1, and a number of reinforcing ribs 2 are fixed on the inner side of each reinforcing hoop; A ring groove 3 and a ring groove 4 are arranged horizontally on the outer circular surface, a force ring 5 is matched in the ring groove, and a sealing ring 6 is arranged in the ring groove; an outer hoop is sleeved on the outside of the two reinforcing hoops 7. A groove 13 is provided on the inner side wall of the outer hoop corresponding to the force ring, and a threaded fastener 8 that passes through the groove is provided on the outer hoop. The threaded fastener is used for The outer hoop and the force ring are abutted and fixed on the reinforcing hoop; a sealing sleeve 9 is sleeved outside the outer hoop, and the length of the sealing sleeve is not less than the length of the outer hoo...
Example Embodiment
[0054] Example 2
[0055] Such as Figure 2-5 As shown, a strong bending mechanical connection structure for connecting precast concrete beam-column piles is provided at the ends of two precast concrete beam-column piles 12 connected to each other with the hoop joint as described in Example 1; the sealing sleeve The sealing and fixing sleeve is arranged on the outer side walls of the ends of the two precast concrete beam-column piles connected with each other.
[0056] The hoop joint includes two oppositely arranged reinforcing hoops 1, a plurality of reinforcing ribs 2 are fixedly connected inside each reinforcing hoop; a ring groove 3 and a ring groove are horizontally spaced on the outer circular surface of each reinforcing hoop 4. A force ring 5 is provided in the ring groove, and a sealing ring 6 is provided in the ring groove; an outer hoop 7 is sleeved on the outside of the two reinforcing hoops, and the inner side wall of the outer hoop corresponds to the force ring A gro...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap