[0024] In this embodiment, a method for forming a test piece of PCCP protective layer mortar in the roller injection process is to directly mix the mortar taken from the production site and divide it into molds for four times; each time the mortar is slightly inserted along the inner wall of the test mold. For the mold, the amount of mold input is as follows: the first time it is installed to 3 / 4 of the height of the steel mold, the second time it is installed until the top of the steel mold is flush, and the third and fourth additions of mortar are respectively 10mm higher than the test mold opening; After each layer is installed, use a press to continuously and evenly load to 13MPa at a speed of 0.5MPa-0.8MPa per second, unload after 20s at a constant pressure, and prepare a mortar specimen according to the method described in Example 8.
Embodiment 2
[0026] A kind of forming method of the test piece of the indoor inspection test piece of the PCCP protective layer mortar of the present embodiment, the mortar taken from the production site is added into the water of 2% of the cementitious material consumption in the mortar mix ratio of the production protective layer, mix well and divide into four Install the mold for the first time; every time the mortar is slightly inserted along the inner wall of the test mold and tamped into the mold, the modulus is as follows: the first time it is installed to 3 / 4 of the height of the steel mold, the second time it is installed until the top of the steel mold is flush, The third and fourth additions of mortar are respectively 10 mm higher than the test mold opening; after each layer is installed, use a press to continuously and evenly load to 13 MPa at a rate of 0.5 MPa to 0.8 MPa per second, and unload after 20 seconds of constant pressure, according to Example 8 The described method ma...
Embodiment 3
[0028] A kind of molding method of the test piece in the room of the PCCP protective layer mortar of the present embodiment, the mortar taken from the production site is added to the water of 4% of the cementitious material consumption in the mortar mix ratio of the production protective layer, mixed well and divided into four parts. Install the mold for the first time; every time the mortar is slightly inserted along the inner wall of the test mold and tamped into the mold, the modulus is as follows: the first time it is installed to 3 / 4 of the height of the steel mold, the second time it is installed until the top of the steel mold is flush, The third and fourth additions of mortar are respectively 10 mm higher than the test mold opening; after each layer is installed, use a press to continuously and evenly load to 13 MPa at a rate of 0.5 MPa to 0.8 MPa per second, and unload after 20 seconds of constant pressure, according to Example 8 The described method makes mortar speci...