A construction method of bored pile
A technology of bored piles and construction methods, applied in sheet pile walls, foundation structure engineering, conjugated synthetic polymer artificial filaments, etc., can solve problems such as shortened service life of steel cages and reduced bearing capacity of pile foundations, and achieve The effect of long service life and good corrosion resistance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] A construction method for bored piles, such as figure 1 shown, including the following steps:
[0040] (1) Level the site, remove debris and determine the pile position; (2) Double power head casing drilling rig is in place; (3) Start the drilling rig, the casing will be drilled with the drill pipe to support the hole wall, and the drill pipe will be taken out after the hole is formed (4) lowering the reinforcement cage and installing the conduit; (5) pouring concrete; (6) pulling out the casing; (7) checking the quality of the pile.
[0041] The concrete includes a rust inhibitor accounting for 1.2% of the cement content. The rust inhibitor includes 40% N,N-dimethylethanolamine, 8% sodium monofluorophosphate, and the balance is water.
Embodiment 2
[0043] A construction method for bored piles, such as figure 1 shown, including the following steps:
[0044] (1) Level the site, remove debris and determine the pile position; (2) Double power head casing drilling rig is in place; (3) Start the drilling rig, the casing will be drilled with the drill pipe to support the hole wall, and the drill pipe will be taken out after the hole is formed (4) lowering the reinforcement cage and installing the conduit; (5) pouring concrete; (6) pulling out the casing; (7) checking the quality of the pile.
[0045] The concrete includes a rust inhibitor accounting for 1.2% of the cement content. The rust inhibitor includes 45% N,N-dimethylethanolamine, 5% sodium monofluorophosphate, and the balance is water.
Embodiment 3
[0047] A construction method for bored piles, such as figure 1 shown, including the following steps:
[0048] (1) Level the site, remove debris and determine the pile position; (2) Double power head casing drilling rig is in place; (3) Start the drilling rig, the casing will be drilled with the drill pipe to support the hole wall, and the drill pipe will be taken out after the hole is formed (4) lowering the reinforcement cage and installing the conduit; (5) pouring concrete; (6) pulling out the casing; (7) checking the quality of the pile.
[0049] The concrete includes a rust inhibitor accounting for 1.2% of the cement content. The rust inhibitor includes 43% N,N-dimethylethanolamine, 7% sodium monofluorophosphate, and the balance is water.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
