Multistage crushing treatment device of building wood waste
A wood waste and processing device technology, which is applied in grain processing, wood particle drying, wood processing appliances and other directions, can solve the problems of troublesome accumulation, low efficiency of wood transportation, mildew and rotten wood, etc. The effect of subsequent processing of rot and convenient subsequent processing
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0022] see Figure 1~4 , in an embodiment of the present invention, a multi-stage crushing and processing device for construction wood waste, including a processing chamber 1 for processing, and the processing chamber 1 is provided with a crushing and cutting mechanism, a heating and drying mechanism, and a material stirring mechanism. The stirring material mechanism is arranged in the lower part of the processing chamber 1, the crushing and cutting mechanism is arranged in the crushing upper cover 4, the crushing and cutting mechanism enters the processing chamber 1 and is fixed on the upper part of the processing chamber 1 by riveting or welding. The inner wall of the material guide plate 2 is matched, and a heating channel 21 is embedded in the side wall of the material guide plate 2. The heating channel 21 is serpentinely arranged in the side wall of the material guide plate 2 (not shown), and the heating The two ends of the channel 21 communicate with the outside world th...
Embodiment 2
[0032] seefigure 1 , in an embodiment of the present invention, a multi-stage crushing device for construction wood waste, on the basis of Embodiment 1, the heating and drying mechanism includes an air intake structure connected to the heating channel 21, connected to the discharge port 9 The air guide structure, the heating chamber 18 connected with the air guide structure, and the gas injection cover 19 communicating with the heating chamber 18 and the processing chamber 1; 21, the first air guide pipe 15, the opening of the exhaust hood 14 is covered with filter cloth, and the inside is filled with activated carbon particles; And the gas outlet is connected with the heating chamber 18, and the heating resistance wire is provided in the heating chamber 18, and the heating resistance wire is arranged in a serpentine shape;
[0033] After starting the air pump 17 and the heating chamber 18 like this, the air flow is filtered and sucked by the exhaust hood 14, and enters the he...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


