Integrated thermal rod pile foundation structure and construction method thereof
A construction method, hot rod technology, applied in the direction of foundation structure engineering, sheet pile walls, bridge parts, etc., can solve the problems of low load capacity of single pile foundation, disturbance of permafrost, lack of heat absorption and heat dissipation, etc., to achieve absorption Good heat and heat dissipation effect, reducing construction period and improving connection strength
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0041] like figure 1 As shown, the present invention provides an integrated thermal rod pile foundation structure, including a thermal rod 2 and a pile foundation 1, a cap 3 and a pier 5 arranged in sequence from bottom to top, and the thermal rod 2 passes through the cap 3 in the axial direction. Embedded in the pile foundation 1 , the evaporation section 21 of the heating rod 2 extends to the bottom of the pile foundation 1 , and the condensation section 22 of the heating rod 2 is exposed on the upper part of the bearing platform 3 .
[0042] The hot rod pile foundation of the present invention is an integrated structure, that is, a pile group foundation composed of a pile foundation 1, a cap 3 and a pier 5. After the pile group foundation is subjected to a vertical load, the cap 3, the pile foundation 2, the frozen soil The interaction of the pile makes the pile side resistance, pile tip resistance, settlement and other properties change. Unlike the single pile, the bearing c...
Embodiment 2
[0048] A construction method for an integrated hot-rod pile foundation structure, the construction method comprising the following steps:
[0049] S1. First, calculate the size, number and reinforcement of the pile group pile foundation 1 according to the bearing capacity, the size, reinforcement and concrete label of the upper cap 3 and pier 5, and the thickness of the concrete cover should meet the relevant specifications;
[0050] According to the principle of energy balance, the size of the heat rod 2 (including the length of the evaporation section 21, the heat insulation section and the condensation section 22 of the heat rod 2), the heat 2 working medium type and filling capacity; in the present embodiment, the diameter design of hot rod 2 is 80cm;
[0051] S2. Carry out pile foundation 2 drilling: use water drill to drill the construction, and drain the water in the hole immediately after drilling to the design depth;
[0052] S3, rolling the pile foundation reinforce...
Embodiment 3
[0056] A construction method for an integrated hot-rod pile foundation structure, the construction method comprising the following steps:
[0057] S1. First, calculate the size, number and reinforcement of the pile group pile foundation 1 according to the bearing capacity, the size, reinforcement and concrete label of the upper cap 3 and pier 5, and the thickness of the concrete cover should meet the relevant specifications;
[0058] Based on the principle of energy balance, the size of the heat rod 2 (including the length of the evaporation section 21, the heat insulation section and the condensation section 22 of the heat rod 2), the heat rod 2 The type of working medium and the filling amount; in this embodiment, the hot rod 2 adopts an L-shaped hot rod with a diameter of 85cm;
[0059] S2. Carry out drilling of pile foundation 1: use water drill to drill holes, and drain the water in the holes immediately after drilling to the design depth;
[0060] S3, rolling the pile f...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 