Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Large-scale sintering project BIM model construction method

A construction method and model technology, applied in the field of BIM model construction of large-scale sintering projects, can solve the problems of low integration of drawings and inability to visually reflect the whole picture of the project, and achieve the effects of high integration, convenient file access, and easy division of labor.

Active Publication Date: 2019-09-10
SHANGHAI ERSHIYE CONSTR CO LTD +1
View PDF3 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] In the construction process of traditional large-scale sintering projects, generally each major carries out construction work according to their own construction drawings. The degree of integration of the drawings is not high, and it cannot directly reflect the overall picture of the project. In terms of construction organization and arrangement, operations are mostly carried out based on construction experience. How to innovate Develop and improve the construction technology to achieve rapid installation, the traditional construction technology analysis method can no longer solve the problem

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Large-scale sintering project BIM model construction method
  • Large-scale sintering project BIM model construction method
  • Large-scale sintering project BIM model construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0030] The present invention will be further described below in conjunction with specific embodiments. It should be understood that these examples are only used to illustrate the present invention and not to limit the scope of the present invention. In addition, it should be understood that after reading the content taught by the present invention, those skilled in the art can make various changes or modifications to the present invention, and these equivalent forms also fall within the scope defined by the appended claims of the present application.

[0031] A method for constructing a BIM model of a large-scale sintering project, comprising the following steps:

[0032] (1) General layout: According to the process flow of the sintering project, plan the involved engineering components to obtain the layout of the sintering project, such as figure 1 shown. The floor plan of the sintering project consists of batching room 7, mixer 11, sintering machine 1, ring cooler 2, finis...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a large-scale sintering project BIM model construction method. The method comprises the following steps of carrying out total plane layout; carrying out construction element model modeling; performing professional module modeling; performing professional model positioning conversion; carrying out regional module modeling; and carrying out overall model construction. According to the present invention, the large-scale sintering engineering BIM overall model is constructed, the integration level is high, the light weight processing of the model is achieved, the degree ofdependence on the computer hardware can be reduced, the constraint that a high-performance graphic workstation needs by the existing large-scale complex engineering modeling is avoided, and the modeling efficiency can be effectively improved.

Description

technical field [0001] The invention belongs to the technical field of engineering model construction, in particular to a method for constructing a BIM model of a large-scale sintering project. Background technique [0002] In the construction process of traditional large-scale sintering projects, each major generally conducts construction operations according to their own construction drawings. The integration of drawings is not high, and the overall picture of the project cannot be visually and intuitively reflected. In terms of construction organization, most operations are carried out based on construction experience. How to innovate To develop and improve the construction technology to achieve rapid installation, the traditional analysis method of construction technology can not be solved very well. As an advanced technical management method, BIM has been successfully applied in civil buildings and large-scale municipal projects. The advanced technical means such as vir...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F17/50
CPCG06F30/18G06F30/13G06F30/20Y02P90/30
Inventor 黄轶宋文智洪陈超
Owner SHANGHAI ERSHIYE CONSTR CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products