Track-type heightening frame device for heightening construction of pier body steel bars and heightening method of track-type heightening device
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- CCCC SHEC FOURTH ENG
- Publication Date
- 2019-11-08
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to a track-type elevated device and a height-connecting method used for the height-connecting construction of pier body steel bars, in particular to a construction method suitable for directional, fast transfer and lengthening of high-pier steel bars. Background technique
[0002] The heightening construction of steel bars mostly adopts the form of manual handling and installation. The construction process is as follows: first, the main reinforcement is transported to the construction platform by a tower crane, and then the workers use the rigid frame inside the pier body as a platform to install it. One person delivers it on the climbing frame platform, and the remaining 3 people work between platforms on different layers of the rigid frame. Connect and place the main reinforcement, and finally the bottom of the main reinforcement is connected with a sleeve, and the hanging part of the main reinforcement is tied to the positionin...