A lifting frame and construction method technology, applied in construction, artificial island, infrastructure engineering and other directions, can solve the problem of not finding the same or similar technical solutions, high requirements for construction and installation accuracy, to improve welding quality and work efficiency, High closing precision and good construction environment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0059] The following examples can enable those skilled in the art to understand the present invention more comprehensively, but the present invention is not limited to the scope of the described examples.
[0060] In the construction method of the lifting frame of the gravel-laying leveling ship of the present invention, the lifting frame is divided into an upper guide unit, two lifting units, and two cylinder units, wherein the lifting unit includes an upper section of the lifting unit and a lower section of the lifting unit, and then , build and process each unit independently, and finally carry and close them on the berth, which can be realized through the following steps:
[0061] The first step is to make the upper section of the lifting unit: the upper section of the lifting unit includes a pair of symmetrically distributed lifting segments, the two lifting segments are relatively distributed, and the adjacent sides of the two lifting segments are in the shape of a cylind...