A kind of slag discharging channel which is easy to disassemble and its installation method
An installation method and channel technology, applied in the direction of vertical pipelines, buildings, building components, etc., can solve the problems of slag discharge efficiency affecting the overall process of the project, excessive construction waste, and large safety hazards caused by dust.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0038] like figure 2 A slag discharge channel that is easy to disassemble. The width and shape of the slag discharge hole 5 are designed according to the amount of slag discharge. The slag discharge holes 5 of the upper and lower floors are coaxial. The sleeves 3 are evenly arranged around the slag discharge hole 5 as a fixed steel pipe column 1, the sleeve 3 of the lower floor is installed at the projection position of the sleeve 3 of the upper floor on the lower floor;
[0039] The main keel with the steel pipe column 1 as the side edge of the slag discharge channel stands in the sleeve 3; in the transverse direction of the steel pipe column 1, 2 steel wires are used to bind the wooden beam 4 for connection and fixation to form a straight prism frame, and then the wooden beam 4 As the pavement beam of the panel 6, the panel 6 is fixed by steel nail binding to form a slag discharge channel unit. The panel 6 can effectively control the dust and slag floating; the steel pipe c...
Embodiment 2
[0053] like figure 2 A slag discharge channel that is easy to disassemble. The width and shape of the slag discharge hole 5 are designed according to the amount of slag discharge. The slag discharge holes 5 of the upper and lower floors are coaxial. The sleeves 3 are evenly arranged around the slag discharge hole 5 as a fixed steel pipe column 1, the sleeve 3 of the lower floor is installed at the projection position of the sleeve 3 of the upper floor on the lower floor;
[0054] The main keel with the steel pipe column 1 as the side edge of the slag discharge channel stands in the sleeve 3; in the transverse direction of the steel pipe column 1, 2 steel wires are used to bind the wooden beam 4 for connection and fixation to form a straight prism frame, and then the wooden beam 4 As the pavement beam of the panel 6, the panel 6 is fixed by steel nail binding to form a slag discharge channel unit. The panel 6 can effectively control the dust and slag floating; the steel pipe c...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com