An inlet runner assembly for stably positioning rod bundles
A technology of inlet runners and rod bundles, applied in the field of nuclear fuel assembly visualization, can solve problems such as displacement and deformation, and achieve the effect of improving accuracy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] Such as figure 1 and figure 2 The shown inlet channel assembly for stably positioning the rod bundle includes an inlet channel 2 for connecting with the intermediate channel, a rod bundle 7 partially located in the inlet channel 2, and also includes a The inlet joint 8, the inner sleeve 3 located in the inlet flow channel 2, one end of the rod bundle 7 extends into the inner sleeve 3, and the surface of the inner sleeve 3 is provided with several through holes 4; In the axial direction, all the through holes 4 are staggered with the inlet connecting pipe 8 . in figure 1 Middle arrows indicate fluid flow paths.
[0027] Further, the inlet joint, the inlet flow channel and the inner sleeve are all cylindrical structures. The inner sleeve is welded to the inlet runner.
[0028] Further, the inner sleeve includes several through holes, and the positions of the through holes are lower than the inlet joint, and the diameter of the inlet joint is smaller than the diamete...
Embodiment 2
[0033] Such as figure 1 and figure 2 In the shown inlet runner assembly, the rod bundle is stably positioned. The fluid enters the inlet runner 2 through the inlet nozzle 8. The inlet nozzle 8 and the inlet runner 2 are both cylindrical structures and communicated by welding. The cross-section of the inlet nozzle 8 The diameter is smaller than the cross-sectional diameter of the inlet channel 2. The fluid then flows into the inner sleeve 3 through the through hole 4 on the inner sleeve 3 . After passing through the rod bundle 7, the fluid flows out from the inner sleeve 3 to the flow channel connecting flange 1, and enters the upper middle flow channel.
[0034] The inlet flow channel 2 is welded with the flow channel connection flange 1 , and the other end of the flow channel connection flange 1 is connected with the middle flow channel through bolts 6 . The other end of the inlet channel 2 is welded together with the end sealing flange 5, and the end sealing flange 5 is ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

