Contaminated soil solidification system
A technology for polluted soil and soil, applied in the field of polluted soil solidification system, can solve the problems of long construction period, damage to the original ecological environment, and high cost, and achieve the effect of improving construction efficiency and improving solidification effect.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0021] see Figure 1 to Figure 2 , the present embodiment provides a contaminated soil solidification system. First, a layered part 1 is provided, which is arranged on one side of the soil layer 2. The layered part 1 is provided with a plurality of layered scale marks 11, and the soil layer 2 is relatively large. A layered scale line 11 is vertically divided into at least two soil unit layers 21, and at least two soil unit layers 21 loosen the soil successively under the action of the earth turning device, and the feeding device includes the first conveying mechanism 3 and the second Two transmission mechanisms 4, the first transmission mechanism 3 includes a track group 31 and a sliding assembly 32, the sliding assembly 32 is slidably installed on the track group 31, and the sliding assembly 32 moves along the extending direction of the track group 31 under the drive of the motor, the second The second transmission mechanism 4 is arranged on the top of the slide assembly 32. ...
Embodiment 2
[0028] see Figure 1 to Figure 2, the figure shows a contaminated soil solidification system provided by Embodiment 2 of the present invention. On the basis of the above-mentioned embodiments, this embodiment further makes the following technical solutions as improvements: the layered component 1 is arranged on On one side of the soil layer 2, a plurality of layered scale marks 11 are arranged on the layered part 1, and the soil layer 2 is vertically divided into at least two soil unit layers 21 in contrast to a plurality of layered scale lines 11, at least two The soil unit layer 21 loosens the soil sequentially under the action of the tiller. The unloading device includes a first transmission mechanism 3 and a second transmission mechanism 4. The first transmission mechanism 3 includes a track group 31 and a sliding assembly 32. The sliding assembly 32 is slidably installed. On the rail group 31, and the sliding assembly 32 moves along the extension direction of the rail gro...
Embodiment 3
[0030] see Figure 1 to Figure 2 , the figure shows a contaminated soil solidification system provided by Embodiment 3 of the present invention. On the basis of the above-mentioned embodiments, this embodiment further makes the following technical solutions as improvements: the layered component 1 is arranged on On one side of the soil layer 2, a plurality of layered scale marks 11 are arranged on the layered part 1, and the soil layer 2 is vertically divided into at least two soil unit layers 21 in contrast to a plurality of layered scale lines 11, at least two The soil unit layer 21 loosens the soil sequentially under the action of the tiller. The unloading device includes a first transmission mechanism 3 and a second transmission mechanism 4. The first transmission mechanism 3 includes a track group 31 and a sliding assembly 32. The sliding assembly 32 is slidably installed. On the rail group 31, and the sliding assembly 32 moves along the extension direction of the rail gr...