Construction Method of Boiler Wall Temperature in Large Units

A construction method and large-scale unit technology, applied in the direction of boiler working status indication, cable laying equipment, etc., can solve problems affecting boiler settlement, etc., and achieve the effects of saving equipment investment, reducing production, and improving efficiency

Active Publication Date: 2021-03-26
POWER CHINA HENAN ENG CO LTD
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In the past, when the boiler wall temperature was installed in the project, the boiler wall temperature was led to the steel platform. During operation, due to the boiler heat sinking, the boiler wall temperature affected the boiler settlement problem.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0078] Embodiment: a large-scale unit boiler wall temperature construction method, the specific steps are as follows:

[0079] A. Construction preparation:

[0080] ⑴ The installation tools and materials for the boiler wall temperature collector block have been prepared;

[0081] ⑵Boiler wall temperature bridge installation tools and materials have been prepared;

[0082] (3) Boiler wall temperature installation tools and materials have been prepared;

[0083] ⑷ Cable laying and wiring tools and materials have been prepared;

[0084] B. Measuring point cleaning and collector block installation:

[0085] (1) After the construction of the boiler roof tube is completed, check the position of the heat collecting block, clean the measuring points, and install the heat collecting block;

[0086] ⑵ After the wall temperature measurement points are checked and correct, mark the position and relative elevation according to the drawing requirements;

[0087] (3) The wall temperatur...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a large unit boiler wall temperature element construction method. The large unit boiler wall temperature element construction method comprises construction preparation, test point cleaning and heat collection block mounting, boiler top wall temperature bridge frame construction, armored thermocouple element mounting, cable laying and cable wiring. The welding position of atest point is determined according to the overall arrangement of the positions, quantity, lengths, specifications and types of boiler wall temperature elements; a heat collection block is welded according to technical requirements; the layering number of boiler ceiling row cable groove boxes and the height of a fixing support are determined; the wall temperature elements are fixed through single-layer bridge frames or multi-layer bridge frames; a wall temperature element protection pipe and an intelligent front end are mounted according to the position of the test point and the positions of the bridge frames; and wall temperature element mounting, bus cable laying and wiring are carried out before boiler top heat preservation construction. According to the layout situation of the wall temperature elements, the intelligent front end is reasonably arranged beside a ceiling bridge frame, the problem that boiler settlement is influenced by conventional boiler wall temperature element mounting is effectively solved, and after the wall temperature elements of a boiler are mounted, effective protection can be realized.

Description

Technical field: [0001] The invention relates to a construction method for boiler wall temperature of a large-scale thermal power unit, and belongs to the technical field of thermal power installation and construction. Background technique: [0002] In large-scale thermal power projects, the stability of the boiler wall temperature is directly related to the safe and stable operation of the boiler, the economic benefits of the power plant, and the sustainable development of the enterprise. With the increasing number of boiler wall temperature control cables and heavy construction workload, boiler wall temperature installation, cable laying and wiring process quality are the focus of project management and control. In the 1000MW large-scale unit, the total installed boiler wall temperature is about 2200. In the past, when the boiler wall temperature was installed in the project, the boiler wall temperature was led to the steel platform, and the boiler wall temperature affect...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): F22B37/38H02G1/06
CPCF22B37/38H02G1/06
Inventor 王正峰张海涛李春张光辉李捷周毅吴高山衡旭太李青松
Owner POWER CHINA HENAN ENG CO LTD