Construction technology with alternative cutting removal and segmental re-jacking of double-side-wall temporary supports in shallow-buried silty-fine sand layer

A technology of temporary support and construction technology, which is applied in shaft lining, tunnel lining, underground chamber, etc. It can solve problems such as safety accidents, large initial support deformation, and internal force exceeding the bearing limit, so as to speed up construction progress and control road surface subsidence , Improve the effect of waterproof quality

Inactive Publication Date: 2020-02-28
CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP OF THE FIFTH ENG +2
View PDF8 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

If the temporary support is removed improperly, it will cause excessive deformation of the initial support or local internal force exceeding the bearing limit, resulting in safety accidents

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0036] The principles and features of the present invention are described below in conjunction with the examples, which are only used to explain the present invention, and are not intended to limit the scope of the present invention.

[0037] Shallow-buried silt and fine sand layer double side wall temporary support skip cutting demolition segmented top construction technology, double side wall 6 pilot tunnels and double side wall 9 pilot tunnels are constructed in sections by jump warehouse method, and temporary support is removed , to chisel off the initial support concrete, then cut off the grid arch frame, adjust and control the length and position of the support removal by jumping back to the top, so as to achieve rapid back support, so that the temporary support is not removed at the same time, but partially removed and timely Back to the top to bear the force, to ensure that the temporary support is always under force during the construction process.

[0038] Further, i...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a construction technology with alterative cutting removal and segmental re-jacking of double-side-wall temporary supports in a shallow-buried silty-fine sand layer, and belongs to the technical field of rail traffic construction technologies. The construction technology includes the steps of carrying out zonal, regional, sectional and segmental construction on a double-side-wall pilot tunnel 6 and a double-side-wall pilot tunnel 9 with an alternative bay method, removing the temporary supports, chiseling away primary support concrete, and then cutting away grid arch trusses. The support removal length and part are adjusted and controlled with an alternative cutting and re-jacking method, rapid re-supporting is achieved, the temporary supports are partially removedand timely bear stress by re-jacking instead of being removed at the same time, and it is guaranteed that the temporary supports are in a stress state all the time in the construction process. According to the construction technology with alterative cutting removal and segmental re-jacking of the double-side-wall temporary supports in the shallow-buried silty-fine sand layer, the temporary supports are removed from inside to outside part by part in each segment of 6-8 m with the alternative bay method, the construction safety can be guaranteed, and multiple working faces can be constructed atthe same time to accelerate the construction progress.

Description

technical field [0001] The invention relates to the technical field of rail transit construction technology, in particular to a construction technology for jumping, cutting, dismantling, and segmented roofing of temporary supports on double side walls of shallow buried silt and fine sand layers. Background technique [0002] The crossing area of ​​the underground railway often forms a large-span tunnel with variable cross-section due to functional requirements. After summarizing the construction methods often used in the construction of the domestic subway crossing area, it is concluded that the shallow buried underground excavation method is currently the preferred method, but because of the large span, it is often used. Supplemented by the CRD method or the double-side-wall pilot tunnel method to control the surface settlement caused by excavation, especially in weak surrounding rock formations. If the temporary support is removed improperly, it will cause excessive deform...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21D9/04E21D11/18E21D11/10E21D11/38
CPCE21D9/04E21D11/10E21D11/107E21D11/18E21D11/38
Inventor 苏春生何十美徐少平马天昌饶胜斌汤振亚梁朋刚李向海刘宏宇
Owner CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP OF THE FIFTH ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products