Large-span concrete-filled steel tube tied bar arch bridge construction method

A technology for concrete filled steel tube and tied arch bridges, which is applied in arch bridges, bridges, bridge construction, etc., and can solve problems such as the influence of hoisting of arch ribs, increased safety risks, and increased costs

Active Publication Date: 2020-04-17
CHINA RAILWAY 19TH BUREAU GRP 1ST ENG +1
View PDF6 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Recently, a lot of pre-assembled bracket assembly methods are used. Most of the brackets are erected at one time, and then the arch ribs are installed. This will ca

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Large-span concrete-filled steel tube tied bar arch bridge construction method
  • Large-span concrete-filled steel tube tied bar arch bridge construction method
  • Large-span concrete-filled steel tube tied bar arch bridge construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0052] Combine below Figure 1-3 The present invention is further described;

[0053] The arch ribs of this tied arch bridge adopt vertical parallel arches, and the arch ribs located on the left side of the bridge deck are from front to back: the front No. 1 left segmental arch rib, the front No. 2 left segmental arch rib, the front No. Left segmental arch rib, front No. 4 left segmental arch rib, front No. 5 left segmental arch rib, front No. 6 left segmental arch rib, closed segment left arch rib, rear No. 6 left segmental arch rib Segmental arch rib, rear No. 5 left segmental arch rib, rear No. 4 left segmental arch rib, rear No. 3 left segmental arch rib, rear No. 2 left segmental arch rib, rear No. 1 left segmental arch rib Segment arch rib. The arch ribs located on the right side of the bridge deck are from front to back: the front No. 1 right segment arch rib, the front No. 2 right segment arch rib, the front No. 3 right segment arch rib, the front No. 4 right segment...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a large-span concrete-filled steel tube tied bar arch bridge construction method and relates to a concrete-filled steel tube tied bar arch bridge construction method, thereby solving problems of long bracket occupation time and the like caused by the existing pre-built bracket assembling method. An arch springing and a continuous beam block 0 are constructed together, and the 2/3 of the length of an arch rib of a section 1 is pre-buried in the arch springing; concrete is poured into a first-section arch rib steel tube; and a first arch rib is firmly welded to a temporary support. A bridge deck girder is constructed and a lower anchor box is pre-buried at a corresponding position of a suspender; and construction from the inside to the two ends is simultaneously carried out according to the sequence of erecting a next support and installing a next section of arch rib. For a closure section, the arc rib on the right side of the closure section is closed and then the arc rib on the left side of the closure section is closed and temporary fixation is performed. The seams between the adjacent sections of arch ribs are welded and fixed; arch rib concrete pouring iscarried out; the support is removed; the suspender is mounted; the suspender is expanded; and steel structure finish paint coating is carried out. The method has the advantages of high construction speed, support proceeding along with the installation progress and sufficient on-bridge operation space.

Description

Technical field: [0001] The invention relates to a construction method of a steel pipe concrete tied arch bridge, in particular to a construction method of a steel pipe concrete tie arch bridge with a span of 150m. Background technique: [0002] Theoretical research and engineering application of concrete filled steel tube structures are becoming more and more in-depth and extensive in our country. When this structure is applied to arch bridges, it shows a great degree of superiority in terms of mechanical properties, construction, economy and aesthetics, which greatly promotes development of arch bridges. The construction methods of concrete-filled steel tube tied arch bridges mainly include cable hoisting method, horizontal ( vertical) rotation construction method, and pre-assembled bracket assembly method. The cable hoisting method needs to arrange cable towers at the bridge head and the bridge tail, and set up cables between the two cable towers, and the cost of this me...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E01D4/00E01D21/00
CPCE01D4/00E01D21/00
Inventor 张兴春周卫霞胡克辉刘长伟许爱军杨玉林阮翔孙巍王权于洋
Owner CHINA RAILWAY 19TH BUREAU GRP 1ST ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products