Three-dimensional horizontal well track optimization design method based on shortest drilling time
A technology with optimized design and the shortest time, applied in design optimization/simulation, geometric CAD and other directions, can solve problems such as shortening drilling cycle, and achieve the effect of shortening drilling cycle, reducing construction difficulty and risk, and saving drilling cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0025] In order to make the purpose, technical solutions and advantages of the present invention clearer, the implementation of the present invention will be further described in detail below in conjunction with the accompanying drawings:
[0026] A three-dimensional horizontal well trajectory optimization design method based on the shortest drilling time, comprising the following steps:
[0027] Step 1: Collect well history data of wells drilled in the same block, and perform ROP statistics according to the well history data of wells drilled in the same block;
[0028] Specifically, according to the history data of wells drilled in the same block, the statistics of the ROP were carried out under the four conditions of the stratum penetrated, the size of the drill bit, the type of the drill bit and the drilling method, and the average value of the ROP under the corresponding conditions was obtained. The formations penetrated are classified according to the strata groups that t...