A Method for Determining the First Iron Tapping of Blast Furnace Revival
A technology of blast furnace and iron output, applied in blast furnace, blast furnace details, furnace and other directions, can solve the problems of air volume usage and large fluctuation of iron volume without considering the rewind period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 2
[0060] Example 2 (2000m3 level blast furnace)
[0061] (1) Air consumption per ton of iron in normal production. The main parameters of the blast furnace during normal production, instrument air volume 3930m3 / min (note: not including oxygen enrichment), oxygen enrichment 7000m3 / h, atmospheric humidity 6g / m3, artificial humidification 5g / m3, average daily iron production 5250 tons / day .
[0062] Hourly artificial humidification volume flow rate=3930*60*5 / 803=1468m3 / h.
[0063] Oxygen per hour=3930*60*(1-6 / 803)*0.21+7000+(1468+3930*60*6 / 803)*0.5=57761m3 / h.
[0064] Oxygen consumption per ton of iron=57761*24 / 5250=264m3 / ton
[0065] Air consumption per ton of iron=264 / 0.21=1257m3 / ton.
[0066] (2) Air consumption per ton of iron during re-airing period. Oxygen consumption per ton of iron during recovery period = (1.1-1.13) * 264 ≈ 290m3 / t. Air consumption per ton of iron during recovery period=290 / 0.21=1380m3 / ton.
[0067] (3) Determine the amount of iron tapped for the fi...