Prefabricated type cable pit and construction method thereof

A prefabricated assembly and construction method technology, applied in artificial islands, water conservancy projects, infrastructure projects, etc., can solve the problems of long construction period, affect the progress of the project, slow speed, etc., and achieve the effect of short construction period, convenient construction quality and fast speed.

Pending Publication Date: 2020-05-01
江苏东尚住宅工业有限公司 +1
View PDF0 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the current cable wells are generally constructed by on-site manual bricklaying or on-site concrete pouring. Due to the uneven skill level of the construct

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Prefabricated type cable pit and construction method thereof
  • Prefabricated type cable pit and construction method thereof
  • Prefabricated type cable pit and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0030] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work shall fall within the protection scope of the present invention.

[0031] It should be noted that when a component is referred to as being "fixed to" another component, it may be directly on the other component or there may also be another intermediate component, which is fixed by the intermediate component. When a component is considered to be "connected" to another component, it can be directly connected to another component or another intermediate component may exist at the same time. When a componen...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a prefabricated type cable pit comprising a prefabricated base board, two prefabricated side walls, two prefabricated end walls and a plurality of bolts. Steel bars are buriedin the prefabricated base board and extend out from the prefabricated base board. The two prefabricated side walls and the two prefabricated end walls are provided with receding holes, and sleeves areburied in the two prefabricated side walls and the two prefabricated end walls. The sleeves communicate with the receding holes. The steel bars extend into the sleeves and extend out from the receding holes. The bolts are connected with the ends of the steel bars in a fastened manner, so that the two prefabricated side walls and the two prefabricated end walls are fixed to the prefabricated baseboard. The two prefabricated side walls and the two prefabricated end walls are both provided with grouting holes. The grouting holes enable slurry fixed-connection layers to be formed between the prefabricated base board and the two prefabricated side walls and between the prefabricated base board and the two prefabricated end walls. During construction, workers just need on-site assembly, and on-site manual bricklaying and on-site concrete pouring are not needed. The construction quality is convenient to manage and control, the construction speed is rapid, and the work period is short. The invention further relates to a construction method of the prefabricated type cable pit.

Description

Technical field [0001] The invention relates to the field of construction, in particular to a prefabricated cable well. Background technique [0002] The cable well is used as a long-distance buried power supply in conjunction with underground pipelines, as a line installation and maintenance cable, which is convenient for construction and maintenance of the cable. However, the current cable wells are generally constructed by on-site manual bricklaying or on-site concrete pouring. Due to the uneven skill level of the construction personnel, the construction quality is not easy to control and control, and the speed and long construction period affect the progress of the project. Summary of the invention [0003] In order to overcome the shortcomings of the prior art, one of the objectives of the present invention is to provide a prefabricated cable well that does not require on-site manual bricklaying or on-site concrete pouring, the construction quality is easy to control, and the...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E02D29/12
CPCE02D29/12
Inventor 朱海清刘亚东赵辉马海英薛飞
Owner 江苏东尚住宅工业有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products