Construction progress management system and construction management method

A construction progress and management system technology, applied in data processing applications, instruments, office automation, etc., can solve the problems that the actual progress of the project cannot be realized, the project progress plan is unreasonable, and the project implementation process is not rigorous, etc., to achieve scientific and reasonable Sexuality, promotion of execution, and control of construction costs

Pending Publication Date: 2020-06-19
HEBEI CONSTR GRP CO LTD
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In the process of project construction, unreasonable project schedule, imprecise project implementation process, lack of professional project management department, and project design changes often lead to the fact that the actual progress of the project cannot be realized according to the planned progress.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction progress management system and construction management method
  • Construction progress management system and construction management method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0030] Below in conjunction with accompanying drawing and specific embodiment the present invention is described in further detail:

[0031] The invention discloses a construction progress management system and a construction management method, which are used to manage the construction, and can complete the construction quickly, efficiently and with high quality through continuous feedback and correction.

[0032] The construction progress management system is based on the computer, which is embedded in the computer and displayed visually through the monitor. figure 1 It is a schematic diagram of the framework of the present invention. The construction progress management system is divided according to the structure, and is divided into two parts: the system management part and the project management part. The system management part includes role management module, authority management module and user management module. The project management part includes the project depart...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a construction progress management system and a construction management method, and belongs to the technical field of construction control and progress management. The systemis divided into a system management part and a project management part according to the architecture of the system. The system management part comprises a role management module, an authority management module and a user management module; the project management part comprises a project department module, an auditing department module and a management department module; and the construction progress management system is embedded in the computer and is displayed through the display. According to the construction progress management system, the continuity and balance of construction can be ensured; the feasibility of construction design is visually analyzed, communication and exchange of all departments are enhanced, problems existing in construction are analyzed by comparing a weekly plan and a monthly plan of the construction progress according to the situation of uploading construction nodes of a project, a construction organization plan is adjusted in time, construction requirementsare met, and delivery and use are conducted on time.

Description

technical field [0001] The invention relates to a construction progress management system and a construction management method, belonging to the technical field of construction control and progress management. Background technique [0002] At this stage, with the development of the construction industry, construction progress management is no longer just a traditional construction period control, but a series of management activities involving a wide range of factors and many factors, which directly affects the economic performance of construction enterprises. benefits and social benefits. In the construction process of engineering projects, unreasonable project schedules, imprecise project implementation, lack of professional project management departments, and project design changes often lead to actual progress of projects that cannot be realized according to the planned schedule. [0003] In order to solve the above problems, a real-time progress management system is ne...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/10G06Q50/08
CPCG06Q10/103G06Q50/08
Inventor 张硕凯赵东李慧龙邢再鹏申月月宋金陈小飞王灏宸黄兴石王然
Owner HEBEI CONSTR GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products