Examples
Embodiment 1
[0072] An adjustable-angle border safety protection railing for a construction site, including a bottom fixing device 1, a vertical bar 2, a horizontal bar 7, a skirting board 8, and a plurality of separate structures for connecting the vertical bar 2, the horizontal bar 7 and the The connecting device for connecting the skirting boards 8 to each other, the connecting device at least includes the lower buckle 3 of the skirting board, the buckle 4 on the skirting board and the slot connector 5 at the end of the cross bar;
[0073] As shown in Figure 2, the bottom fixing device 1 is welded by a bottom connecting plate 11 and a short tube 12, and a connection hole 13 is opened on the side of the short tube 12 close to the upper 1 / 3 position, and the corresponding connection The hole 13 is welded with a nut 14 for connection, and the fastening bolt 15 passes through the nut 14, and four bolt holes 16 are provided on the bottom connecting plate 11 for fixing with the structural part...
Embodiment 2
[0086] An installation and construction method of an adjustable angle border safety protection railing for a construction site:
[0087] That is, the installation and construction method of the adjustable angle border safety protection railing for the construction site described in the above-mentioned embodiment one, it is to make each separate structural part of the construction site with the adjustable angle border safety protection railing in the factory, and then at the construction site according to needs to be assembled, it includes the following steps:
[0088] A. The bottom fixing device 1, the vertical bar 2, the cross bar 7, the skirting board 8, and the lower buckle 3 of the skirting board for connecting the vertical bar 2 and the cross bar 7 and the vertical bar 2 and the skirting board 8 in the factory to make a separate structure, Buckle 4 on the skirting board, slot connection piece 5 at the end of the cross bar and slot connection piece 6 for extension of the c...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com