Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Labor support cost overall planning comprehensive management method in construction industry

A technology of labor security and comprehensive management, applied in office automation, data processing applications, instruments, etc., can solve the problems of irregular construction market order, raising qualification thresholds, illegal subcontracting and subcontracting, etc. Simple and clear effect

Pending Publication Date: 2020-07-28
西安通软软件科技有限公司
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The invention provides a comprehensive management method for labor security expenses in the construction industry, which solves the problem that the development of the construction industry in our province is facing irregularities in the order of the construction market due to the absence of supervision. Disorderly competition has become a chronic disease that cannot be cured for a long time. Because the owner is in an abnormally strong position, he violates regulations, fails to perform the contract, forces the contractor to advance construction, construction with capital, designates subcontractors, designates procurement of materials and equipment, and defaults on project payments, etc. , in the actual bidding process, additional conditions are added at will, and the qualification threshold is raised. Small and medium-sized projects also require qualifications above the first level to bid, causing high-end companies to crowd out the low-end market in disguise, and low-end companies to impact the high-end market in disguise. The lack of integrity of employees, illegal subcontracting and subcontracting, multiple licenses, and insufficient personnel and equipment have caused major hidden dangers in project construction and project quality and safety, which have seriously affected and restricted the healthy development of the construction industry.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Labor support cost overall planning comprehensive management method in construction industry

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0024] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0025] Please refer to figure 1 ,in, figure 1 It is a schematic diagram of the overall structure of a method for overall planning and comprehensive management of labor security expenses in the construction industry. A method for overall planning and comprehensive management of labor security expenses in the construction industry, including project development plans, demand specifications, database design, operation manuals, test plans, test reports, and operation and maintenance.

[0026] Further, the specific steps of the comprehensive management method of labor security expenses in the construction industry are as follows:

[0027] 1) The project development plan includes real-name system management system, construction permit management system, statistical report system, integrity system management system, supervision system management system, admi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a labor support cost overall planning comprehensive management method in the construction industry. The method comprises a project development plan, a demand specification, a database design, an operation manual and a test plan. The labor support cost overall planning comprehensive management method for the construction industry has the advantages that the development bottleneck of the construction industry is effectively broken through; the construction industry is enhanced; related personnel are organized to be combined with mass route education practice activities todeeply enter construction enterprises for investigation, rush to multiple place for investigation learning, the development situation and characteristics of the construction industry are summarized; aroad suitable for further development of the construction industry is discussed; the integrity and qualification dynamic supervision system in the construction field is accelerated and perfected; related policies standardize owner market behaviors are given out, building enterprises are optimized and upgraded by applying an information technology, the construction enterprises are encouraged to comprehensively improve the management level by combining information and a network technology with modern management, and establish a credit management system composed of a unified credit regulation system, a unified credit evaluation standard and a unified credit reward and punishment mechanism.

Description

technical field [0001] The invention relates to the technical field of overall planning and comprehensive management of labor security expenses in the construction industry, in particular to a method for overall planning and comprehensive management of labor security expenses in the construction industry. Background technique [0002] The construction industry is an important pillar industry of the national economy, which plays an important role in supporting and guaranteeing economic and social development and the improvement of people's lives. The government attaches great importance to making the construction industry bigger and stronger, and regards improving the development speed, quality and level of the construction industry as a current and A central task for the future. [0003] The development of the existing construction industry is facing the problem of irregular construction market order caused by the absence of supervision. The integrity system and market sup...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/10G06Q50/26
CPCG06Q10/105G06Q50/26
Inventor 赵国光曹杰刘玉峰李超高艳辉侯赞江
Owner 西安通软软件科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products