Zone area self-healing optimization control method and system based on flexible interconnection

The invention relates to a transformer area self-healing optimization control method and system based on flexible interconnection. The method comprises the following steps: S1, constructing an operation monitoring network based on equipment ledgers in a transformer area; s2, deploying flexible interconnection equipment at key nodes of a transformer area to realize fault isolation and power failure transfer, dynamic load transfer and voltage regulation, and flexible cooperative control of a distributed power supply and energy storage equipment; s3, introducing an equipment state evaluation model based on the transformer area operation data obtained by the operation monitoring network, and obtaining state evaluation and risk early warning of each equipment in the transformer area; s4, constructing a flexible interconnection dynamic topology management mechanism between the stations, and dynamically adjusting the interconnection topology between the stations according to the load transmission demand and the power supply condition; and S5, based on state evaluation and risk early warning of each device, performing load regulation and control and fault recovery according to a dynamic topology management mechanism of flexible interconnection. According to the invention, efficient and intelligent transformer area operation and power supply reliability improvement are realized.
Owner:HAIDONG POWER SUPPLY COMPANY STATE GRID QINGHAI ELECTRIC POWER +2

Method and device for stabilizing demand by using energy storage and controllable load

The invention discloses a method and a device for stabilizing demand by using energy storage and a controllable load, and relates to the field of power control. In the method, a target reason for demand increase is determined according to a first moment corresponding to the maximum demand; generating a demand stabilizing strategy according to the power regulation data of the target enterprise, wherein the power regulation data comprises the installed capacity of an energy storage system, the first capacity of an adjustable flexible load and the second capacity of an interruptible load; when the occurrence of the target reason is detected, judging whether the real-time power is greater than the existing maximum demand in the current period and a demand stabilizing target value in a stabilizing strategy or not; and when the real-time power is greater than the existing maximum demand in the current period and the demand stabilizing target value in the stabilizing strategy, controlling the energy storage system to discharge according to the stabilizing strategy, and / or adjusting the load capacity of the adjustable flexible load, and / or adjusting the load capacity of the interruptible load. By implementing the technical scheme provided by the invention, the demand stabilizing effect and the system resource utilization rate are improved.
Owner:NANJING ZHONGDIAN KENENG TECH CO LTD

Power distribution network load transfer control method and system based on neural network decision distillation

The invention discloses a power distribution network load transfer control method and system based on neural network decision distillation, and belongs to the technical field of power grid operation optimization, and the method comprises the steps: collecting power distribution network data, and constructing a power distribution network load transfer control data set; converting the power distribution network load transfer control data set into graph data; training a graph neural network model based on the graph data to perform high-dimensional feature extraction on the power distribution network load transfer control data set, obtaining a switch state prediction result and outputting a load transfer control strategy; respectively training a decision tree model by using the original input of the graph neural network model and the high-dimensional features and the switch state prediction result extracted from the graph neural network model by adopting a knowledge distillation technology, and minimizing the difference between the output of the decision tree model and the output of the graph neural network model; and the trained decision-making tree model is utilized to match the specific characteristics and decision-making results of the power grid state, and a decision-making basis for load transfer control of the power distribution network is provided. According to the invention, the operation state of the power grid can be predicted more accurately.
Owner:CHINA ELECTRIC POWER RESEARCH INSTITUTE CO LTD

Automatic dispatching control system based on photovoltaic power generation

The invention relates to the technical field of automatic dispatching and management of a power system, and discloses an automatic dispatching control system based on photovoltaic power generation, which comprises a photovoltaic power generation unit used for converting solar energy into electric energy and monitoring power generation power and power generation efficiency in real time; the energy storage unit is electrically connected with the photovoltaic power generation unit and is used for storing redundant electric energy and intelligently releasing the electric energy according to the load state of the power grid; the meteorological monitoring module is used for collecting and predicting meteorological data in real time, the meteorological data comprise sunlight intensity, temperature, wind speed and the like, and generating a short-term weather forecast; and the demand response management system is electrically connected with the power grid and the user side equipment, and the system intelligently identifies non-critical load equipment by monitoring the load of the power grid in real time. The intelligent scheduling module is combined with meteorological prediction and real-time data, so that the system can dynamically adjust the output power of the photovoltaic power generation unit, ensures that the power generation capacity is matched with the power grid demand, reduces the power waste, and maximizes the utilization of renewable energy sources.
Owner:周杨

Question and answer method, device and equipment based on large language model and storage medium

The invention discloses a question answering method, device and equipment based on a large language model and a storage medium, and the method comprises the steps: obtaining a to-be-answered question through employing client equipment, and recognizing the type of the to-be-answered question; calling the first large language model by using the client device, identifying a question to be answered based on the question type of the question to be answered, generating at least two candidate answers, and sending the candidate answers to the cloud device; and calling the second large language model by adopting the cloud equipment, performing accuracy verification on the at least two candidate answers based on the semantics of the to-be-answered question, determining a target answer, and returning the target answer to the client equipment. Through the technical scheme, the operation pressure of the cloud equipment and the operation cost of the large language model are reduced.
Owner:BEIJING FACE WALL INTELLIGENT TECHNOLOGY CO LTD

Distribution network reactive power optimization method considering reactive power support provided by electric vehicle charger

ActiveCN119030051Asmooth load curveReduce pressure on power supplyLoad forecast in ac networkSingle network parallel feeding arrangementsTransformerElectric vehicle
The invention relates to the field of power system management and optimization, and discloses a distribution network reactive power optimization method considering reactive power support provided by an electric vehicle charger, and the method comprises the following steps: S1, building an electric vehicle operation model considering the reactive power support provided by the electric vehicle charger; s2, establishing an on-load voltage regulating transformer and capacitor bank operation model; s3, constructing a power flow constraint of the power distribution network based on a second-order cone relaxation algorithm; and S4, on the basis of the established variables and constraint conditions, taking the lowest comprehensive operation cost of the distribution network as a target function, and constructing a distribution network reactive power optimization model considering reactive power support provided by the electric vehicle charger and a solving method of the distribution network reactive power optimization model. According to the invention, through orderly control of charging and discharging of the electric vehicle, a power grid load curve can be effectively smoothed, load pressure in a peak period can be reduced, and through consideration of reactive power support of the charging pile, action times and switching gears of traditional reactive power / voltage regulation equipment in the power distribution network can be effectively reduced, system network loss can be reduced, and economical efficiency of operation of the power distribution network can be improved.
Owner:ZHAOQING UNIV

Integrated energy storage management system and energy management method

The invention relates to the field of energy storage management, and discloses an integrated energy storage management system and an energy management method, and the system comprises an energy storage unit which is used for storing and releasing electric energy; according to the invention, through the dynamic demand response power optimization formula and the energy storage system state estimation formula, the control unit can adjust the charging and discharging behavior of the energy storage unit in real time so as to respond to the peak reduction or load transfer signal of the power grid and dynamically adjust the charging and discharging power and the duration, thereby improving the energy utilization efficiency; the control unit can automatically reduce or stop the discharging operation of the energy storage unit to reduce the load peak value of the power grid and reduce the operation pressure of the power grid, can increase the charging amount of the energy storage unit in the valley period of the power grid, and responds to peak value reduction or load transfer signals of the power grid by adjusting the charging and discharging behaviors. Therefore, efficient, safe and stable operation of the energy storage system is realized, and economic remote monitoring and management of the energy storage system are realized.
Owner:ZHEJIANG BOSI GUANGTONG TECH CO LTD

Performance index prediction method and device, storage medium and electronic equipment

The embodiment of the invention provides a performance index prediction method and device, a storage medium and electronic equipment. The method comprises the following steps: acquiring a target performance prediction model sent by a server through target equipment; obtaining a storage performance feature sequence of the target equipment in the performance detection period; sequentially inputting the plurality of storage performance characteristics into a variable selection network in a target performance prediction model to obtain index weight sets matched with the plurality of storage performance characteristics respectively, and determining a plurality of target storage performance characteristics according to the plurality of storage performance characteristics and the index weight sets matched with the plurality of storage performance characteristics respectively; and inputting a target performance feature sequence composed of a plurality of target storage performance features into a time convolutional network in the target performance prediction model to obtain a performance index prediction result at the target moment.
Owner:INSPUR SUZHOU INTELLIGENT TECH CO LTD

Hydrogen direct-fired supercritical carbon dioxide energy storage power generation device system and operation method

The invention provides a hydrogen direct-fired supercritical carbon dioxide energy storage power generation device system and an operation method. The hydrogen direct-fired supercritical carbon dioxide energy storage power generation device system comprises a hydrogen production and storage unit, a carbon dioxide energy storage unit and a hydrogen fuel combustion power generation unit. And the hydrogen production and storage unit and the carbon dioxide energy storage unit are respectively connected with the hydrogen fuel combustion power generation unit. Two energy storage media of liquid carbon dioxide and high-energy-density green hydrogen are used for energy storage, and super-long-time energy storage can be achieved; and heat energy is subjected to cascade coupling application, stored heat and turbine exhaust heat are fully used for a carbon dioxide cyclic heating heat source, the external emission heat loss of the system is reduced, and the system efficiency is high.
Owner:SHANGHAI POWER EQUIPMENT RESEARCH INSTITUTE CO LTD

Sulfate-containing waste liquid treatment system and method for acrylonitrile and acrylonitrile combination device

The invention provides a sulfate-containing waste liquid treatment system and a sulfate-containing waste liquid treatment method for acrylonitrile and a combination device thereof, the system comprises at least two sets of waste liquid treatment units and a set of flue gas treatment unit, sulfate waste liquid is divided into two strands to enter the two sets of waste liquid treatment units for combustion, waste heat utilization and quenching purification, the discharged sulfur-containing flue gas is collected and enters a set of flue gas treatment unit, the sulfur-containing flue gas subjected to deep cooling, demisting and drying can be directly used for producing high-purity sulfuric acid, and a two-end and one-tail mode is adopted, so that the operation flexibility of the system is improved, and the treatment pressure is reduced. In the waste liquid treatment unit, a high-temperature reaction device adopts segmented air distribution, so that sufficient combustion of waste liquid is ensured, and SO2 loss is reduced; a special temperature field and structural design in the waste heat boiler can prevent the heat exchange device from scaling and blocking; a venturi scrubber is adopted in the quenching purification device to quench the flue gas, and a protective liquid film is formed on the contact interface of the high-temperature flue gas and a liquid phase, so that the temperature of equipment is effectively reduced, and corrosion of the high-temperature flue gas is prevented.
Owner:SHANGHAI SHENGLANHUI TECHNOLOGY CO LTD

Intelligent airport scene operation scheduling system based on virtual simulation

The invention discloses an intelligent airport scene operation scheduling system based on virtual simulation, and belongs to the field of airport resource scheduling. Comprising an acquisition preprocessing module, a modeling simulation module, a demand analysis module, an environment monitoring module, a traffic flow optimization module, a detection early warning module, a decision support module, a monitoring feedback module, a dynamic scheduling module, a command execution module and a performance evaluation module. The method can prevent problems in advance instead of passively dealing with the problems, effectively reduces the operation pressure and resource conflicts in peak periods, reduces the occurrence of congestion conditions, can make more economical and efficient decisions in resource use, reduces the extra cost caused by resource waste or improper allocation, remarkably improves the flexibility of the system in dealing with emergencies, and improves the safety of the system. The problem of falling into local optimum is avoided, the robustness and adaptability are greatly improved, the continuity and smoothness of airport operation are ensured, and large-scale delay is avoided.
Owner:NANJING UNIV OF AERONAUTICS & ASTRONAUTICS

High-speed dragging device and method applied to vibration test of permanent magnet synchronous servo motor

The invention discloses a high-speed dragging device and method applied to a permanent magnet synchronous servo motor vibration test, and relates to the technical field of motor vibration tests. The motor testing device comprises a testing platform arranged on a testing box and a motor to be tested, a driving roller is arranged at the driving end of the motor to be tested, and the motor testing device further comprises a positioning testing unit which comprises a positioning assembly and a testing assembly; and the dragging load unit comprises a loading assembly, a damping assembly and an accelerating assembly. The device has the advantages that the vibration speed test and the overall displacement vibration test of the driving end of the to-be-tested motor can be synchronously carried out, the flexible adjustment of the load capacity can be realized in a non-stop dragging state, the test efficiency can be improved, the test sample data can be increased, the precision of the test result is improved, and the test cost is reduced. And meanwhile, effective damping can be carried out when the load is adjusted, vibration is prevented from being transmitted to the motor to be tested to influence the accuracy of a test result, and the test precision is higher.
Owner:HANGZHOU NAZHI MOTOR CO LTD

Quaternary ammonium salt modified strong anion monolithic column

The invention relates to a quaternary ammonium salt modified strong anion monolithic column, and discloses a monolithic column material, and quaternary ammonium salt groups are grafted on the internal surfaces of pores and channels in the monolithic column material. The quaternary ammonium salt group exists in the form of EP-OCH2CH (OH) CH-N + R1R2R3. The monolithic column prepared by the invention is rich in hydroxyl groups, has excellent compatibility to an elution object containing biomacromolecules, has excellent specific adsorption capacity for nucleic acid substances, and is suitable for enrichment and separation of DNA and / or RNA substances.
Owner:YU JI (SHANGHAI) BIOLOGICAL TECH CO LTD

A vehicle lane recognition system, method and storage medium based on vehicle-mounted camera

The present application discloses a lane recognition system, method and storage medium based on a vehicle-mounted camera, and relates to the field of image processing technology. The system includes an image acquisition module configured to acquire images of at least the road in front of the vehicle and the road behind the vehicle through a vehicle-mounted camera, an image processing module configured to perform image processing on the acquired road images, a road condition fitting module configured to form a road model by fitting the processed images corresponding to the front of the vehicle and the processed images corresponding to the rear of the vehicle based on the image processing module, and a lane recognition module configured to mark and display the lane line interval where the vehicle is located based on the processed images corresponding to the front of the vehicle and the road model corresponding to the image processing module. The method is applicable to the above-mentioned system, and the storage medium stores a computer program that implements the method when executed by a processor. The present application can provide lane conditions to users intuitively and quickly, and has high reliability.
Owner:HEBEI HAIKANG BOSHI TECH CO LTD

Vortex tube-based water-electrolysis hydrogen production water-water separation system and process

The invention discloses a vortex tube-based water-electrolysis hydrogen production water-water separation system and process, and particularly relates to the technical field of water-electrolysis hydrogen production. A water-water separation system for hydrogen production through electrolysis based on a vortex tube comprises a heat dissipation area, a cyclone filtering integrated dust remover, the vortex tube, a filter and a booster pump, saturated wet hydrogen with the temperature below 50 DEG C is introduced into one side of the heat dissipation area, the other side of the heat dissipation area is connected with the cyclone filtering integrated dust remover, and the heat dissipation area is used for cooling hydrogen after spraying and cooling. The cyclone filtering integrated dust remover is connected with a vortex tube, the cyclone filtering integrated dust remover is used for removing liquid water in the hydrogen cooled by the heat dissipation area and conveying the filtered hydrogen into the vortex tube, and the vortex tube is used for separating high-temperature and low-temperature hydrogen. The water-electrolysis hydrogen production water-water separation system and process based on the vortex tube have the advantage of being simple.
Owner:HENAN UNIV OF URBAN CONSTR +1

Full-amount treatment system for low-carbon landfill leachate

The invention relates to a full-amount treatment system for low-carbon landfill leachate. The full-amount treatment system comprises a pretreatment unit, an anaerobic treatment unit, an external membrane bioreactor unit, a nanofiltration unit and a reverse osmosis unit which are connected in sequence, the external membrane bioreactor unit comprises a denitrification reactor, a nitration reactor and an ultrafiltration membrane; effluent of the anaerobic treatment unit enters a denitrification reactor, effluent of the denitrification reactor enters an ultrafiltration membrane to generate concentrated sludge, and part of the concentrated sludge flows back to the denitrification reactor; produced water of the ultrafiltration membrane assembly enters a nanofiltration unit; the nanofiltration unit generates nanofiltration produced water, the nanofiltration produced water enters the reverse osmosis unit to be treated to generate reverse osmosis produced water, and the reverse osmosis produced water is discharged or recycled; the nanofiltration concentrated solution enters a nanofiltration concentrated solution treatment unit to be subjected to flocculent precipitation and oxidative degradation treatment, and generated water returns to the external membrane bioreactor unit from the second water tank; the reverse osmosis concentrated solution enters the reverse osmosis concentrated solution treatment unit to be subjected to oxidative degradation, precipitation separation and evaporative crystallization treatment so as to generate recycled evaporative condensate water. The device has the characteristics of excellent effluent quality and low energy consumption.
Owner:XUANANG ENVIRONMENTAL TECH CO LTD

Incremental data offline synchronization method in data development

The invention relates to an incremental data offline synchronization method in data development, and the method comprises the steps: carrying out the threshold comparison according to the business table data size of each developer, judging whether to call a preset data incremental synchronization tool (Maxwell or Cana), if yes, calling the data incremental synchronization tool, and otherwise, carrying out the data synchronization through a written script. Therefore, the increment synchronization tool is flexibly called according to the numerical value of the service data set, and a fixed increment synchronization tool can be prevented from being frequently scheduled and used, so that the situation that the increment synchronization tool frequently occupies a background running memory is reduced, the data running pressure is reduced, and the safety of a background running system is improved. And meanwhile, incremental synchronization and updating of the data can be realized, and the consistency and the real-time performance of the data are ensured.
Owner:HANGZHOU GUANSHU INFORMATION TECH CO LTD (CHINA)

Building energy-saving control system for construction site

The invention relates to the field of building energy-saving control for a construction site, in particular to a building energy-saving control system for the construction site. Comprising an energy monitoring module, an environment monitoring module, an equipment management module, an energy analysis module, an environment analysis module, a personnel positioning regulation and control module and a real-time scheduling module, the equipment management module is used for maintaining and managing all construction site equipment of a construction site, and the personnel positioning regulation and control module is used for carrying out real-time scheduling through a positioning technology. The distribution condition of constructors in the field is obtained, energy is reasonably distributed according to energy requirements of different devices, and the real-time scheduling module intelligently controls lighting and ventilation devices in a specific area according to environment parameters obtained in real time. Real-time energy consumption monitoring and intelligent equipment operation control become reality, and a solid technical foundation is laid for research, development and application of a building energy-saving control system for a construction site.
Owner:GUANGDONG KAIHU CONSTR CO LTD

Process management method and device, computer equipment and readable storage medium

The invention relates to the technical field of vehicles, in particular to a process management method and device, computer equipment and a readable storage medium. The process management method comprises the steps of obtaining a state switching instruction for a target service; wherein the target service corresponds to a function group, and the function group comprises service processes of the target service in different service states; determining a target service state of the target service according to the state switching instruction; and running the business process corresponding to the target business state in the function group, and stopping running the business process corresponding to the non-target business state in the function group.
Owner:CHENGDU CELIS TECH CO LTD

Cooperative scheduling method and system for multiple reactive power resources of power distribution network, terminal and medium

The invention discloses a power distribution network multi-reactive power resource cooperative scheduling method and system, a terminal and a medium, and relates to the technical field of power scheduling. An electric vehicle aggregator is regarded as a charging load and a continuous reactive power compensation device to participate in power grid dispatching; establishing a power distribution network deterministic reactive power optimization model under the participation of the electric vehicle; converting the power distribution network deterministic reactive power optimization model according to the scene data to obtain a scene clustering-based two-stage distribution robust reactive power optimization model; and constraining the probability deviation of each discrete scene, and solving by adopting a column sum constraint generation algorithm. Through scene clustering, EV charging load fluctuation, EV reactive power capacity fluctuation and conventional load fluctuation which are finally caused by various random factors can be effectively represented, and the problem that large-scale electric vehicles participate in distribution network reactive power optimization and are difficult to estimate, regulate, control and cooperate is solved.
Owner:STATE GRID SICHUAN ELECTRIC POWER CORP ELECTRIC POWER RES INST

A screw press

The present invention provides a screw press, comprising: a frame; a feed hopper; a pressing screw connected to the feed hopper for pushing materials; a driving motor connected to the pressing screw for driving the pressing screw to move; a screen located between the pressing screw and the frame; a back pressure device connected to the slag discharge end of the pressing screw for squeezing the materials pushed by the pressing screw to obtain solid slag and slurry; a discharge port arranged at the slag discharge end of the pressing screw for discharging solid slag; a slurry mixing and sand removal hopper arranged below the screen for accommodating slurry filtered by the screen; a sand lifting screw connected to the slurry mixing and sand removal hopper for discharging heavy materials in the slurry through the sand discharge port at the end of the sand lifting screw; and a slurry outlet for discharging the slurry after sand removal. According to the present invention, the solid-liquid separation of materials is better achieved, the resource recovery rate is improved, and at the same time, the operating pressure and load of subsequent processing equipment are reduced, and the service life and maintenance cycle of the equipment are extended.
Owner:EVERBRIGHT ENVIRONMENTAL TECH CHINA CO LTD

Yaw control method and device for typhoon-resistant wind turbine generator system and storage medium

The invention discloses a yaw control method and device for a typhoon-resistant wind turbine generator system, a storage medium, an electronic device and a computer program product. The method comprises the steps that when it is determined that the remaining duration of typhoon reaching the wind turbine generator system is smaller than a first preset duration according to meteorological data, the typhoon reaches the wind turbine generator system; the voltage and current transformation equipment is controlled to supply power to the wind turbine generator set by adopting electric energy provided by an external power grid and charge the energy storage equipment; and controlling the wind turbine generator system to stop generating power when determining that the residual duration of the typhoon reaching the wind turbine generator system is less than a second preset duration or monitoring that the wind speed is greater than a set value. When it is determined that the external power grid is powered off, the energy storage device is controlled to supply power to the wind turbine generator; and based on power supply of the energy storage equipment, the yaw direction of the wind turbine generator is controlled to be consistent with the wind direction of the typhoon. The operation safety of the wind turbine generator set under the extreme weather condition is ensured, the typhoon resistance of the wind turbine generator set is improved, and the damage risk of typhoon to the wind turbine generator set is reduced.
Owner:HUANENG (FUJIAN) ENERGY DEV CO LTD +2

Mercaptopyridine modified monolithic column

The invention discloses a monolithic column material. Pyridine groups are grafted on the inner surfaces of pores and channels in the monolithic column material. The pyridyl exists in the form of EP-OCH2CH (OH) CH-SPy, and the structural formula is shown in the description. The monolithic column prepared by the invention is rich in hydroxyl groups, has excellent compatibility to an elution object containing biomacromolecules, has excellent specific adsorption capacity for nucleic acid substances, and is suitable for enrichment and separation of DNA and / or RNA substances.
Owner:YU JI (SHANGHAI) BIOLOGICAL TECH CO LTD

MLAG environment flow load balancing method, equipment and medium

The invention discloses an MLAG environment flow load balancing method, equipment and a medium, belongs to the technical field of MLAG environment flow control, and is used for solving the problem that a load sharing method for configuring link convergence on uplink and downlink equipment at present can only carry out load sharing on incremental messages such as mac, ip and the like and cannot solve large-flow load balancing of the same mac and the same ip. The method comprises the following steps: establishing an MLAG link aggregation group; performing flow statistics on the downlink device in an incoming direction to obtain first flow information; according to the first traffic information, controlling the traffic to move to the first forwarding device and / or the second forwarding device, and respectively counting second traffic information moving to the first forwarding device and third traffic information moving to the second forwarding device; and according to the second flow information and the third flow information, whether a flow imbalance condition occurs is judged, and if yes, flow load balance adjustment is carried out on the two forwarding devices by adjusting the bandwidth used by the port.
Owner:INSPUR NETWORK TECH (SHANDONG) CO LTD

Explosion-proof video conference system and video conference implementation method

The invention relates to the technical field of television image communication, in particular to an anti-explosion conference television system and a conference television implementation method. The method comprises the following steps: acquiring an original conference image stream through multi-source image acquisition, performing displacement compensation and multi-resolution fusion, generating a standardized image stream, simulating conference communication transmission, checking image feature quality, deducing equipment load, analyzing the bearing capacity of the explosion-proof conference television, and obtaining a bearing capacity change curve; and according to the curve, screening out a limit load point, carrying out load reduction segmentation, generating a low-load image stream, carrying out path redistribution on the low-load image stream, forming a path distribution matrix, and realizing real-time transmission so as to ensure effective operation of the explosion-proof conference television. According to the invention, a safer and more efficient explosion-proof conference television realization method is realized.
Owner:SHENZHEN MEIJIA TECH CO LTD

A method for improving cable insulation performance based on production process parameter adjustment

The present invention discloses a method for improving the insulation performance of a cable based on the adjustment of production process parameters, which relates to the technical field of cable preparation, and includes: obtaining characteristic material use parameters; establishing an adjustment model of the characteristic material use parameters for the insulation performance of the cable; establishing an adjustment model of the laying thickness for the insulation performance of the cable; forming a critical amplitude of the improvement of the insulation performance of the cable; when the property of the improvement of the insulation performance of the cable is a significant improvement, using the adjustment model of the laying thickness for the insulation performance of the cable to improve the insulation performance; when the property of the improvement of the insulation performance of the cable is a slight improvement, using the adjustment model of the characteristic material use parameters for the insulation performance of the cable to improve the insulation performance. By establishing an adjustment model of the characteristic material use parameters for the insulation performance of the cable and establishing an adjustment model of the laying thickness for the insulation performance of the cable, the scheme with the lowest cost is selected to reduce the operating pressure of the enterprise.
Owner:HEFEI UNIV OF TECH +1

Energy storage system coordination controller and control method

The invention provides an energy storage system coordination controller and a control method, an electric energy control strategy prediction model is deployed in the energy storage system coordination controller, an electric energy control instruction matched with power grid operation data and electric energy index data is identified and output, the electric energy control instruction is reported to an upper computer, and the upper computer executes the electric energy control instruction on energy storage equipment. Therefore, the AI model is deployed on the controller to identify and output the electric energy control instruction matched with the operation condition and the system index of the energy storage equipment, and the electric energy control instruction is transmitted to the upper computer to execute control on the energy storage equipment, so that intelligent recommendation and management of the control strategy can be realized by utilizing the model, the maintenance difficulty of the control strategy is reduced, and the maintenance efficiency is improved. Only one-key updating of model training data is needed subsequently, and the dimension is simple. And the upper computer only needs to carry out equipment coordination control management according to the feedback electric energy control instruction, so that the background operation pressure is greatly reduced, the control management efficiency of mass energy storage equipment is improved, and the applicability is enhanced.
Owner:HANGZHOU XINGFENG INTELLIGENT TECH CO LTD

Material conveying device for a cogeneration combustion boiler

ActiveCN224589926UFlexible change of volume shapeRealize sliding
This utility model relates to the field of conveying device technology, and in particular to a material conveying device for a cogeneration combustion boiler. The technical solution includes a support frame, a set of transmission rollers rotatably arranged between the support frames, and a transmission belt between the transmission rollers; a motor fixedly mounted on one side of the support frame, the output end of the motor being connected to one end of the transmission rollers via a diverter; and multiple connecting plates fixedly mounted on the outer wall of the transmission belt, with a hopper assembly for material conveying fixedly mounted on one side of each connecting plate. This utility model allows for flexible adjustment of the hopper's volume and shape according to actual production needs, thereby precisely controlling the material conveying amount, avoiding excessive or insufficient material conveying, reducing energy waste, lowering equipment operating pressure, and ensuring stable boiler combustion and production capacity output.
Owner:CHANGZHOU XINGANG THERMOELECTRICITY

Transformer fault diagnosis method based on feature selection and improved IPSO-BP-Adaboost

The invention discloses a transformer fault diagnosis method based on feature selection and improved IPSO-BP-Adaboost, and the method comprises the following steps: calculating an out-of-bag error rate through a random forest, screening out a gas combination which is most beneficial to the improvement of diagnosis precision, carrying out the optimization of parameters of a double-hidden-layer back propagation network through an improved particle swarm algorithm, and carrying out the optimization of the parameters of the double-hidden-layer back propagation network. And an Adaboost algorithm is used to improve the robustness of the IPSO-BP diagnosis model. According to the method, four strategies of SPM chaotic mapping based on reverse learning, adaptive inertia weight, spiral flight search and crisscross variation are innovatively introduced to improve the particle swarm optimization. According to the method, the problems that a traditional particle swarm algorithm is prone to falling into local optimum, low in convergence speed and insufficient in population diversity are solved; the defect that a traditional BPNN network is sensitive to the weight and bias of neurons is overcome; the accuracy of the diagnosis result is greatly improved, and the stability of the model diagnosis result is ensured.
Owner:JIANGSU UNIV OF TECH +1

Modular filtering device for air compressor

The modularized filtering device for the air compressor comprises a protective shell, a ventilation cover is fixedly installed on the upper end face of the protective shell, a limiting supporting ring is installed on the inner side of the upper end of the protective shell, a filtering net is arranged on the upper end face of the limiting supporting ring, and a first damping sealing ring is arranged on the side edge of the upper end face of the filtering net. A partition mounting frame is mounted on the inner side of the first damping sealing ring, and a plurality of bidirectional ventilation mechanisms are fixedly mounted at the upper end of the partition mounting frame. A first supporting spring is arranged in the middle of the upper end face of the partition mounting frame, an air guide frame is fixedly mounted on the outer side of the middle of the partition mounting frame, and a vibration motor is fixedly mounted on the upper end face of the air guide frame. Air entering the air compressor is filtered, the filtering pressure of a filter element of the air compressor is effectively reduced, the service life is prolonged, dust blockage is avoided, the air compressor can be self-sealed, and the sealing effect of the air compressor is kept when the air compressor is not used.
Owner:SUZHOU HONGBEN MASCH MFG CO LTD