Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

2results about How to "Normative behavior" patented technology

ESD wrist strap monitoring external trigger induction dormancy device

ActiveCN224067018Unormative behaviorPrevent false standby stateGeological measurementsMicrocomputerMicrocontroller
The utility model discloses an ESD wrist strap monitoring external trigger induction dormancy device. The device comprises an ESD equipment host (1). And the wrist strap induction hooks (3) are used for detecting whether an operator wears an ESD wrist strap or not, and the wrist strap induction hooks (3) are connected with the ESD wrist strap through contact induction. According to the ESD wrist strap monitoring external trigger induction dormancy device provided by the utility model, a contact type induction and light sensor interlocking mode is adopted, so that the behavior that an operator wears a wrist strap on duty can be effectively standardized, a false standby state caused by personnel departure or wearing counterfeiting is prevented, and meanwhile, a false alarm condition caused by light sensation false triggering is avoided; the lever principle is utilized to press the inductive switch to realize level grounding, multiple groups of signals are detected through the single-chip microcomputer, whether an operator correctly wears the wrist strap and is on duty is judged, and reliable realization of fool-proof and mistake-proof functions is ensured.
Owner:DONGGUAN INNOVATION YIPIN TECHNOLOGY CO LTD

Road construction process online monitoring system, method and electronic device

PendingCN122198356AImplement visual monitoringnormative behaviorData processing applicationsDesign optimisation/simulation
The application relates to a road construction process online monitoring system, method and electronic equipment, and belongs to the technical field of road construction process monitoring and management. The system comprises a data acquisition end, a data management and analysis end and a supervision terminal. The data acquisition end is used for collecting construction physical parameters and three-dimensional space information of a road construction site through a field detection device, and constructing a BIM three-dimensional simulation model based on the three-dimensional space information. The data management and analysis end is used for preprocessing the construction physical parameters, and monitoring different construction procedures in the road construction process through multiple monitoring subsystems and the preprocessed parameters to generate index data. The supervision terminal is used for displaying the BIM three-dimensional simulation model. The construction physical parameters and the index data are contained in the BIM three-dimensional simulation model. The road construction process online monitoring system provided by the application improves the field construction quality and the data utilization rate in the construction process, and realizes visual monitoring of a road slope construction site.
Owner:WUHAN UNIV OF TECH