A technology of composite stratum and tunnel structure, which is applied in tunnels, tunnel linings, underground chambers, etc., can solve the problems that it is difficult to apply to composite strata that are soft at the top and hard at the bottom, difficult to construct in the hard stratum at the bottom, and excessive settlement, so as to improve the rigidity , reduce excavation, and improve the effect of stress
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment approach
[0082] As a specific implementation manner of the embodiment of the present invention, step S2 includes the following steps:
[0083] S2.1. Before the excavation of the tunnel, advance geological forecast is carried out to determine the distribution of soft and hard geological conditions ahead, especially to find out the geological characteristics of the junction between soft and hard, so as to prepare for the subsequent tunnel construction.
[0084] S2.2. Install advanced support 6 on the upper soft stratum to pre-reinforce the upper soft stratum. Advance support 6 is a kind of auxiliary measures taken ahead of tunnel face excavation to ensure the stability of tunnel excavation working face. The methods mainly include pipe shed, small conduit, horizontal jet grouting pile and so on. In this method, the small catheter method is used.
[0085] S2.3. Manual and mechanical construction cooperate to excavate the upper left pilot pit 71 at the junction of the composite stratum; i...