Reinforcing method for reinforcing structure with cracks in bridge piers
A technology for strengthening structures and cracks, applied in bridge reinforcement, bridges, bridge construction, etc., can solve problems such as easy spalling of concrete, spalling of protective layer, and reduction of bridge bearing capacity, so as to reduce the tendency of cracks to spread in depth and reduce aggravated damage Possibility, the effect of reducing the possibility of falling off
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0048] refer to figure 1 , a reinforcement structure for bridge pier cracks, which includes a positioning piece 3 and a fixing piece 4 relatively arranged on the side wall of the crack 2, the positioning piece 3 and the fixing piece 4 form a positioning group 5, and there are Several positioning groups 5, the side wall of the pier 1 is provided with a sealing plate 7 for sealing the crack 2, the side wall of the sealing plate 7 is provided with a partition plate 70 inserted into the crack 2, the sealing plate 7 and the partition plate 70 Steel plates are preferably used, and the partition plate 70 is located between adjacent positioning groups 5. The partition plate 70 cuts the space in the crack 2 into multiple regions 701, and the side wall of the sealing plate 7 and the top of the crack 2 are provided with a barrier. Broken plate 702; the crack 2 is separated by the partition plate 70, and each area 701 is filled successively, so that the filler can fill the crack 2, reduce...
Embodiment 2
[0067] A method for strengthening bridge pier cracks, the specific construction method is:
[0068] (1) First, the worker cleans the crack 2 of the pier 1, removes the loose residues in the crack 2, and corrects the crack 2 into a regular shape, preferably V-shaped, so as to facilitate the later cutting of the shape of the partition plate 70, and then On the opposite side walls of the crack 2, two opposite positioning grooves 20 are drilled. According to the shape of the crack 2, the partition plate 70 and the blocking plate 702 are cut and welded on the sealing plate 7, and the wooden stopper 700 is inserted into the in the third opening 78;
[0069] (2) Install the positioning plate 30 and the fixing plate 40 in the positioning groove 20 respectively, the steel wire rope 6 connects the two opposite positioning plates 30 and the fixing plate 40, the worker holds the sealing plate 7 close to the crack 2, and separates the separating plate 70 and the blocking plate 702 are ins...