Construction method and construction device for hard rock stratum pile foundation in low-clearance narrow space
A narrow space and construction method technology, applied in mining equipment, drilling equipment, infrastructure engineering, etc., can solve the problems of high risk and low work efficiency of manual digging piles, and achieve the effect of solving low work efficiency and solving dust pollution
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0046] The present invention will be further described below in conjunction with the accompanying drawings. It should be noted that this embodiment is based on the technical solution, and provides detailed implementation and specific operation process, but the protection scope of the present invention is not limited to the present invention. Example.
[0047] figure 1 It is a construction drawing of a pile foundation construction method and construction equipment in a hard rock stratum under a low headroom and narrow space according to an embodiment of the present invention; figure 2 It is a structural schematic diagram of the drilling equipment structure of a pile foundation construction method and construction equipment in a hard rock stratum under a low headroom and narrow space according to an embodiment of the present invention; image 3 It is a structural schematic diagram of the drilling equipment structure of a pile foundation construction method and construction equ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


