Rapid dust removal system for tunnel blasting

A dust removal system and tunnel technology, applied in dust prevention, safety devices, mining equipment, etc., can solve the problems of low dust suppression efficiency, high dust concentration, limited effect of air supply and dust suppression, and achieve the goal of avoiding conflicts and ensuring construction progress Effect

Pending Publication Date: 2020-09-11
CHINA RAILWAY SHANGHAI ENGINEERING BUREAU GROUP CO LTD
View PDF0 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] In tunnel construction, the concentration of dust generated in the tunnel after blasting is very high, and the dust reduction efficiency of natural settlement is low. Operators in the next process have to wait for a long time after blasting to enter the tunnel face for construction. The waiting process has greatly affected the progress of the tunnel construction
The traditional dust suppression method also includes using the air intake system to supply air for dust reduction, but the dust suppression effect of the air supply is limited, and the dust concentration near the tunnel face cannot be effectively reduced. Lining trolleys conflict with each other, affecting the progress of tunnel construction

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Rapid dust removal system for tunnel blasting
  • Rapid dust removal system for tunnel blasting
  • Rapid dust removal system for tunnel blasting

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0021] The rapid dust removal system for tunnel blasting in this embodiment includes a tunnel sealing trolley, a high-pressure air supply unit and a dust removal device;

[0022] see figure 1 and figure 2 The tunnel sealing trolley 5 is arranged at the front end of the inverted arch lining, and the tunnel sealing trolley 5 closes the operation area of ​​the tunnel surface 11 to form a closed dust removal area 12 .

[0023] Such as figure 1 , Figure 4 and Figure 5 As shown, the high-pressure air supply unit includes an air compressor unit 1 and a booster fan 3, the air compressor unit 1 is arranged outside the tunnel hole, and the booster fan 3 is arranged on the tunnel sealing trolley 5, connected to the air compressor unit 1 The high-pressure air supply pipe 2 between the booster fan 3 is arranged in the tunnel cable duct; the air supply hose 4 is arranged, the inlet end of the air supply hose 4 is connected to the outlet of the booster fan 3, and the outlet of the air...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a rapid dust removal system for tunnel blasting. The rapid dust removal system involves a tunnel sealing trolley, a high-pressure air supply unit and a dust removal device, wherein the tunnel sealing trolley of the rapid dust removal system is arranged at the front end of an inverted arch lining, the tunnel sealing trolley seals a tunnel face operation area, and a sealed dust removal area is formed; an air compressor unit in the high-pressure air supply unit is arranged outside a tunnel hole, booster fans are arranged on the tunnel sealing trolley, and a high-pressure air supply pipe connected among the booster fans of the air compressor unit is arranged in a tunnel cable trough; the inlet end of an air supply hose is connected with outlets of the booster fans and supplies air towards the tunnel face, so that reflection airflow from the tunnel face to the side where the tunnel sealing trolley is located is formed in the dust removal area; the dust removal deviceis arranged on the tunnel sealing trolley, an exhaust opening of the dust removal device is located in the side facing the tunnel face, and an exhaust opening is located in the other side opposite tothe exhaust opening. According to the rapid dust removal system for the tunnel blasting, the tunnel dedusting efficiency can be improved, the conflict between an original air supply pipe and a tunnelsecondary lining trolley workshop is eliminated, and the construction progress is guaranteed.

Description

technical field [0001] The invention relates to the field of tunnel construction, in particular to a fast dust removal system for tunnel blasting. Background technique [0002] In tunnel construction, the concentration of dust generated in the tunnel after blasting is very high, and the dust reduction efficiency of natural settlement is low. Operators in the next process have to wait for a long time after blasting to enter the tunnel face for construction. The waiting process has greatly affected the progress of the tunnel construction. The traditional dust suppression method also includes using the air intake system to supply air for dust reduction, but the dust suppression effect of the air supply is limited, and the dust concentration near the tunnel face cannot be effectively reduced. Lining trolleys conflict with each other, affecting the progress of tunnel construction. Contents of the invention [0003] In order to avoid the shortcomings of the above-mentioned pri...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21F5/20E21F5/00E21F5/04
CPCE21F5/00E21F5/04E21F5/20
Inventor 唐俊杨再兴肖延军包亮亮江佛林颜志伟
Owner CHINA RAILWAY SHANGHAI ENGINEERING BUREAU GROUP CO LTD