Rock drilling drill boom
A technology of rock drilling and jib, which is applied in the field of rock drilling equipment, can solve the problems of affecting the blasting effect, uneven rock drilling section, and affecting the degree of freedom of activities, so as to improve the space utilization rate, reduce the layout space, and directly link the effect Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0035] Such as figure 1 and figure 2 As shown, it is a rock drilling boom, which includes a boom support platform 1, a main boom swing seat 2, a main boom 5, a telescopic component, a rotating connector 11, a propulsion beam assembly 12, a pitch-translation component and a component capable of driving all The main arm 5 swings horizontally while maintaining the horizontal angle of the propulsion beam assembly 12. The swing arm translation assembly, the main arm 5 is a rectangular tubular structure, and one end of the main arm swing seat 2 is vertically hinged (at The so-called vertical hinge here is to hinge through the vertical twisted shaft, so that under the normal placement state of the rock drilling arm, the hinged position can move horizontally, but cannot move vertically) on the boom support platform 1, the other end is connected to the One end of the main arm 5 is hinged horizontally (the so-called horizontal hinged here is hinged by a horizontal twisted shaft, so th...
Embodiment 2
[0045] The present embodiment is similar to embodiment 1, and its difference is:
[0046] In this embodiment, the propulsion beam pitching and leveling cylinder 10 and the main boom pitching cylinder 6 are respectively located on the upper and lower opposite sides of the main boom 5, and one end of the third oil passage 610 is connected to the rod cavity , the other end is connected to the third cavity 609; in this embodiment, since the telescopic assembly and the main arm 5 are on the same straight line, the line where the main arm 5 is located is the dividing line, and the main arm pitch cylinder 6 is located below the dividing line , the cylinder barrel of the propulsion beam pitch leveling cylinder 10 is connected above the dividing line, when the main boom pitch cylinder 6 stretches out, the propulsion beam pitch leveling cylinder 10 also stretches out to level the angle; the main boom pitch cylinder 6 When retracting, the propulsion beam pitch leveling oil cylinder 10 al...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 