Method for preventing and controlling ice lake bursting type flood debris flow
A debris flow and flood technology, applied in the field of prevention and control of glacial lake outburst floods
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] A certain watershed on the Qinghai-Tibet Plateau belongs to a tributary on the left side of the upper reaches of Palong Zangbo, with a watershed area of 118 km 2 ,, there is a glacial lake at an altitude of 3800m, the channel length in the downstream area of the glacial lake is 10km, and the average aspect ratio is 5%. Through on-site investigation, the storage capacity is about 300×104m when the ice lake is full of water 3 . The glacial lake collapsed in 1988, with a maximum peak flow of 1150m 3 / s. In order to minimize the threat and harm to the railways, highways, water conservancy facilities, residential areas and farmland in the lower reaches of the glacial lake, the method for preventing and controlling glacial lake outburst debris flow of the present invention is adopted, and the specific implementation steps are as follows:
[0038] Step 1. According to the field survey and combined with the actual terrain conditions, the 0-2km downstream of the moraine d...
Embodiment 2
[0054] A certain watershed on the Qinghai-Tibet Plateau is located in Gongbu Jiangda County, with a watershed area of 150km 2 , there is a glacial lake at an altitude of 5000m, the channel length in the downstream area of the glacial lake is 20km, and the average aspect ratio is 5%. According to the field survey, the storage capacity is about 600×104m when the ice lake is full of water 3 . The glacial lake collapsed in 1964, with a maximum peak flow of 2800m 3 / s. In order to minimize the threat and harm to the railways, highways, water conservancy facilities, residential areas and farmland in the lower reaches of the glacial lake, the method for preventing and controlling glacial lake outburst debris flow of the present invention is adopted, and the specific implementation steps are as follows:
[0055] (1) According to the terrain conditions, the 0-3km downstream of the moraine dam is defined as the upstream area, the 3-15km is defined as the middle reaches, and the 1...
PUM
Property | Measurement | Unit |
---|---|---|
Channel length | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com