Construction method of stone-filled embankment
A construction method, technology of stone embankments, applied in roads, roads, buildings, etc., can solve problems such as water affecting the quality of roadbeds
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0032] Various embodiments of the invention will be described in more detail below with reference to the accompanying drawings. In the various drawings, the same elements are denoted by the same or similar reference numerals. For the sake of clarity, various parts in the drawings have not been drawn to scale.
[0033] refer to figure 1 with figure 2 , the application provides a construction method for rock-filled embankments, comprising:
[0034] Step 1, processing the ground bed 1, obtaining the bearing capacity data of the ground bed 1, and when the bearing capacity of the ground bed 1 cannot meet the overall weight of the rock-filled embankment, the ground bed 1 is treated, Replacement or compaction treatment.
[0035] The bearing capacity of the ground subgrade Among them, r i is the compacted weight of packing material of type i; h i In order to design i kinds of filling heights, including the converted height of the traffic load; [δ] is the allowable bearing cap...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com