Pushing construction method of double-width steel box girder
A technology of jacking construction and steel box girder, applied in bridges, bridge construction, erection/assembly of bridges, etc., can solve the problems of long demolition time, high construction cost, steel box girder error, etc. The effect of high construction efficiency and less investment in equipment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0025] The present invention will be described in further detail below in conjunction with the accompanying drawings and examples.
[0026] see figure 1 , figure 2 , present embodiment is a kind of jacking construction method of double width steel box girder, carries out as follows:
[0027] A. Build a construction platform
[0028] A permanent guardrail platform 2 is set on the upper part of both sides of the permanent pier 1, and the permanent guardrail platforms 2 on both sides are connected by connecting beams 2-1, and the permanent guardrail platform 2 is used to provide walking passages for construction workers during the pushing process ( Figure 5 , Figure 6 shown);
[0029] B. Installation of pushing equipment
[0030] The top surface of the permanent pier 1 is provided with a plurality of bearing pad stones 3 ( image 3 , Figure 4 As shown), the leveling steel plate 4 is placed on the upper part of the support pad stone 3, the leveling steel plate 4 is clos...