Circuit for preventing malfunction of bus voltage parallel circuit
A technology of bus voltage and malfunction, applied in the direction of circuit devices, emergency protection circuit devices, electrical components, etc., can solve the problem of short-circuit current burning secondary equipment and circuits, non-compliance with parallel or release of normal operating procedures, and safe and stable power supply of power systems Hidden dangers and other problems to achieve strong adaptability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0043] This embodiment provides a circuit for preventing the malfunction of the busbar voltage parallel circuit, such as figure 1 and 2 , including QK changeover switch, 1G auxiliary contact of isolating switch, 2G auxiliary contact of isolating switch, FDL1 auxiliary contact of circuit breaker and PT parallel relay BLJ, among which:
[0044] One end of the QK switch is connected to the positive power supply, the other end of the QK switch is connected to one end of the 1G auxiliary contact of the isolating switch, and the other end of the 1G auxiliary contact of the isolating switch is connected to the FDL1 auxiliary contact of the circuit breaker The other end of the auxiliary contact of the circuit breaker FDL1 is connected to one end of the auxiliary contact of the isolating switch 2G, the other end of the auxiliary contact of the isolating switch 2G is connected to one end of the PT parallel relay BLJ, and the PT is parallel The other end of the relay BLJ is connected to...
Embodiment 2
[0055] This example Figures 3 to 4 , on the basis of Embodiment 1, it also includes a blocking closing relay BSJ and a section circuit breaker auxiliary contact FDL2, one end of the blocking closing relay BSJ is connected to the negative power supply of the parallel relay BLJ, and the blocking closing relay BSJ The other end of the section circuit breaker auxiliary contact FDL2 is connected to one end, and the other end of the section circuit breaker auxiliary contact FDL2 is connected to the other end of the QK switch.
[0056] A normally open contact BSJ-1 is set in the blocking closing relay BSJ, which is connected with the normally open contact starting locking element of the existing closing control circuit of the section circuit breaker, so as to realize the control of the closing operation circuit of the section circuit breaker. Operation is blocked.
[0057] A normally closed open contact BSJ-3 is also set in the locking and closing relay BSJ, which is connected with...
Embodiment 3
[0064] This example Figures 5 to 6 , on the basis of Embodiment 2, it also includes PT allowing de-loading relay JSJ, first bus PT three-phase voltage monitoring relay DYJ1, second bus PT three-phase voltage monitoring relay DYJ2, first bus PT isolation switch PT-1G auxiliary The contact and the auxiliary contact of the second busbar PT isolating switch PT-2G, in which:
[0065] The PT allows one end of the decoupling relay JSJ to be connected to the negative power supply of the parallel relay BLJ, and the other end of the PT allows the decoupling relay JSJ to be respectively connected to one end of the second busbar PT three-phase non-voltage monitoring relay DYJ2, the second Connect one end of the PT-2G auxiliary contact of the busbar PT isolating switch, the other end of the second busbar PT three-phase non-voltage monitoring relay DYJ2 is connected to one end of the first busbar PT three-phase non-voltage monitoring relay DYJ1, the second busbar The other end of the PT i...
PUM