Damage-free quick mounting and dismounting temporary anchoring device and damage-free quick mounting and dismounting temporary anchoring method
A temporary anchor and non-damage technology, which is applied in the erection/assembly of bridges, bridges, buildings, etc., can solve problems such as failure and bridge instability, and achieve the effect of simple structure, high compression performance, and intelligent construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment approach 1
[0049] Specific implementation mode one: as figure 1 and figure 2 and Figure 5 As shown, the non-damage quick installation and disassembly temporary anchoring device in this embodiment includes four sets of detachable steel structures arranged between the upper platform and the lower platform connected by the swivel ball joint, and the upper platform , the embedded parts respectively set in the lower cap; the embedded parts in the upper cap and the lower cap are temporarily anchored by detachable steel structures; the multiple detachable steel structures are located between the upper cap and the lower cap The outer part of a set of legs arranged along the circumferential direction. The four groups of detachable steel structures are arranged in an orthogonal manner, that is, a set of steel structures is respectively set between the upper cap and the lower cap at the positions corresponding to the extension direction of the main beam on both sides of the upper cap in front o...
specific Embodiment approach 2
[0053] Specific implementation mode two: as figure 1 , figure 2 and image 3 As shown, the integrated embedded part 2 in this embodiment includes an upper annular piece 2-1, a lower annular piece 2-2, and several vertical strips 2-3 for connecting the two annular pieces; There are several connecting holes on the upper ring piece 2-1 and the lower ring piece 2-2; each steel structure unit 1 is provided with connecting holes on the upper end plate 1-2 and the lower end plate 1-3; The lower annular piece 2-2 of the pre-embedded integral embedded part 2 of the upper platform is flush with the lower end surface of the upper platform, and the upper annular piece 2-2 of the integrated embedded part 2 of the lower platform is flush with the lower end surface of the upper platform. The end surface under the platform is flush, and the connection hole of the upper end panel 1-2 of each steel structure unit 1 is detachably connected with the connection hole of the lower ring piece 2-2 ...
specific Embodiment approach 3
[0054] Specific implementation mode three: as figure 1 , figure 2 and Figure 4 As shown, the integral embedded part in this embodiment is made of steel plate with several ring pieces with connecting holes. Other components and connections are the same as those in the first embodiment.