Permanent/temporary retaining wall structure quick to splice on site and construction method
A technology of permanent combination and construction method, applied in infrastructure engineering, underwater structures, excavation, etc., can solve problems such as road damage, long rescue time, and river water surge, saving rescue time, providing safety, reducing damage effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0038] Example: such as Figure 1 to Figure 5 As shown, a permanent-facing combined retaining wall structure that is quickly assembled on site includes a frame unit close to the side slope of the roadbed and a protective net 5 arranged outside the frame unit;
[0039] The frame unit includes a plurality of horizontal tubes 1 and a plurality of supporting units;
[0040] The supporting unit includes a horizontal tube 1 and a column unit, the column units are two, and the supporting unit is arranged along the width direction of the roadbed;
[0041] The column unit includes a vertical pipe 4 and a six-way pipe 2. The horizontal pipe 1 is necked at both ends, and the vertical pipe 4 is necked at one end. The vertical pipe 4 and the horizontal pipe 1 have the same size as the six-way pipe 2. Match, the necked end of the vertical pipe 4 is inserted into the six-way pipe fitting 2;
[0042] The same sides of the two column units are connected by a horizontal tube 1, and both ends of the ho...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com