A filter element and tank technology, which is applied in the field of sewage treatment, can solve the problems of poor chromium removal filler and adsorption time, increased difficulty in water treatment, and increased treatment costs, and achieves good removal effect, good environmental benefits, social benefits, and costs. low effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0041]The cross-sectional size of the packing device is determined according to the rainfall situation in each region. Taking Nanjing in 2014 as an example, the design standard for the rainfall intensity in Nanjing is 98.106 (L / s ha) for I, and 0.45 for the runoff coefficient C. Water area A is 1.5ha, and C, I and A are brought into formula Q=CIA (a) and can get: runoff Q=CIA=0.45*98.106*1.5=66.2 (L / s); The flow velocity V of quick filter tank Take 14m / h, put the runoff Q and V into formula A 0 The horizontal cross-sectional area A of tank body 1 is obtained in =Q / V (b) 0 =Q / V=66.2(L / s) / 14(m / h)=17m 2 The height of the tank body 1 is selected as 1.2m. After the size of the tank body 1 is determined, the filter element 6 is socketed in the tank body 1 and connected with the inner wall of the tank body 1. After determining the size of the filter element 6, the tank body 1, the water inlet pipe 2, the outlet Water pipe 3, water inlet valve 4, water outlet valve 5, filter element...
Embodiment 2
[0044] Containing Cr with a concentration of 10mg / L 6+ The runoff water flows into the filler device with a height of 20cm for the chromium removal filler through the water inlet pipe 2. After staying in the device for 20min, a water sample is taken from the outlet pipe 3, and its concentration is 0.5mg / L, the removal rate of chromium is 95%.
Embodiment 3
[0046] Cr at a concentration of 10mg / L 6+ The runoff water flows into the device with a height of 20cm through the water inlet pipe 2, and after the device stays for 40min, a water sample is taken from the outlet pipe 3, and its concentration measured by a plasma emission spectrometer (ICP-OEX) is 0.32 mg / L. The removal rate of chromium is 96.8%.