Assembled concrete-filled steel tube frame structure system
A technology of concrete-filled steel tube and concrete-filled steel tube columns, which is applied in the field of prefabricated concrete-filled steel tube frame structure systems, to achieve the effects of simple structure, clear transmission path, and reliable and effective node connection
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0020] like figure 1 , 2 As shown, a prefabricated CFST frame structure system includes a beam-column integral prefabricated node 1, a CFST beam 4 and a CFST column 5. The beam-column integral prefabricated node 1 includes a vertically arranged column connecting section and a horizontal The beam connecting section is laid, the beam connecting section and the column connecting section are integrally formed, the column connecting section and the beam connecting section are both composed of steel pipes, the beam connecting section is fixed on the column connecting section, and the steel pipe is filled with There is concrete, and the side of the column connecting section and the beam connecting section used for connecting with the concrete-filled steel tube beam-column is the connecting end. There are grouting holes reserved on the top, and the beam connecting section and the column connecting section are covered with fireproof board or brushed with fireproof paint, and the steel...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


