PBOM and process route integrity checking system
A technology of completeness check and process route, which is applied in the field of PBOM and process route integrity check system, can solve the problems of PBOM and process route display not intuitive, guarantee correctness, high professional level requirements, etc., to reduce time cost and labor cost, Fast and effective integrity check, simple and clear result return
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] Using the above scheme, take the production order and purchase order of a certain circuit board as an example.
[0029] The attribute checking module confirms the integrity attributes of the PBOM and the routing, and through the analysis of the attributes of each field of the PBOM and the routing, the integrity attribute table of the PBOM and the routing is obtained as shown in Table 1.
[0030] Table 1 Integrity attribute table of PBOM and routing
[0031] Check field range MAST, STKO, Stop, PLPO Effective BOM value STKO–STLST=1 Effective Routing Value PLKO–STATU=4
[0032] The BOM verification module checks the line item data of the specified material in the STPO table, queries the STLNR in the MAST table according to the material code, and then queries the data in the STPO table according to the STLNR. If it exists, it means that the material code exists in the PBOM, and each layer The material code recursively performs data verificatio...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


